100 likes | 115 Views
Join us at the E166 Collaboration Meeting to discuss the progress and results of the background tests and beam tuning strategies. Explore simulations and CsI shielding for the E166 project.
E N D
E166Collaboration MeetingSLAC, October 24-26, 2003J. C. Sheppard
E166 Collaboration Meeting Where Friday:Fuji Room, Bldg. 214 Saturday-Monday:ROB Redwood Room, Bldg 48 Who Naomi Nagahashi: Admin, Bldg 214 Nick Arias: Computers, Bldg 214 Vinod Bharadwaj: Talks, Schedule, Complaints
SLAC Hotel E166 Collaboration Meeting Redwood Room, ROB Fuji Room, B214
E166 Collaboration Meeting What Friday-Saturday Noon: E166 Background Test Saturday PM-Sunday Noon: E166 Polarized Positron Production Test Then Sunday PM-Monday PM: POWER Meeting (see Gudi Moortgat-Pick)
E-166 Activities EPAC/SLAC Approval in June, 2003 Formation of Background Test Review Committee, June 2003 Mini-Workshop on E166 Backgrounds: July, 2003 E166 Collaboration Meeting: October, 2003 Background Test Review: October 31, 2003 SLAC Tech. Div. Schedule Discussion: Week of November 3, 2003 EPAC Status Report: November 14-15, 2003
E-166 Activities, cont’d T467: Detector and DAQ Development in FFTB: since April, 2003 Installation of Background Test equipment: February, 2004 Background Tests: February-July, 2004, tbd E166 Polarized Positron Production: January, 2005
E166 Background Test T467: Background Test and Beam Results: Achim Weidemann Beam Tuning Strategies: Franz-Josef Decker Simulations: Overview-what do we want: John Sheppard Background simulation for E166: Yuri Batygin CsI Shielding: Gary Bower Results from FLUKA: Vinod Bharadwaj