An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GEM-TPC Meeting Bernhard Ketzer Technische Universität München 14 February 2008 Telephone Conference

  2. Agenda • Communications (B. Ketzer) • Design of fieldcage and endplate (B. Voss) • Design of drift and GEM foils (F. Garcia, t.b.c) • Status of n-XYTER chip (B. Voss) • Status of AFTER chip (I. Konorov) • Test setup at ELSA (A. Winnebeck) • Beam tests in 2008/2009 • a.o.t.

  3. Communications • JointGEM proposal • accepted within I3HP2 • total sum 1.1 M€ (cut by 50%), to be submitted to EU end of February • Proposal to G-PAC at GSI • PANDA prototype TPC test in FOPI in 2009 • presentation at G-PAC Meeting on 5 March • New Postdoc (Xiaodong ZHANG, Lantzou) at TUM E18 from 10 March on • Next meeting: 4 March, 9:00-12:00 at GSI (PANDA coll. week)

  4. MoU for TPC prototype • Participating institutes: • TUM E18, TUM E12, HIP, SMI, GSI det. lab, HISKP, FOPI • Build two identical detectors: • PANDA prototype • CB-ELSA central tracker • Responsibilities, financing • 2009 • prototype TPC ready • testing and commissioning (FOPI / ELSA) • 2010 • physics run in FOPI • installation and commissioning in CB-ELSA • 2011 – 2012 • physics run in CB-ELSA

  5. Tasks - Responsibilities

  6. Cost for TPC prototype

  7. PANDA TPC Work Packages