1 / 23

AFPMB / ITC Integrated Pest Management Information System (IPMIS) Update 12-Feb-04

AFPMB / ITC Integrated Pest Management Information System (IPMIS) Update 12-Feb-04. Presented by John Bresnahan Envirosoft, Inc. (703) 624-9144 jpbresnahan@envirosoftinc.com. Why Do You Need IPMIS?. Comply with the Federal Insecticide, Fungicide, Rodenticide Act (FIFRA)

Download Presentation

AFPMB / ITC Integrated Pest Management Information System (IPMIS) Update 12-Feb-04

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AFPMB / ITCIntegrated Pest Management Information System (IPMIS) Update12-Feb-04 Presented by John Bresnahan Envirosoft, Inc. (703) 624-9144 jpbresnahan@envirosoftinc.com

  2. Why Do You Need IPMIS? • Comply with the Federal Insecticide, Fungicide, Rodenticide Act (FIFRA) • Easily and quickly retrieve data • Accurately and consistently be able to report the installations data to meet current and future DOD measures of merit (MOMs) • Allow for the easy review of installations activities

  3. What Information Does IPMIS Track / Maintain? • Installation • Pest Management Plan Summary • Personnel - DoD & State Cert. • Pesticide Inventory • Contract / Contractor

  4. What Information Does IPMIS Track? • Daily Operation Task Information • Activity performed • Pesticide(s) Used • Personnel Involved and time spent • Location • Pest(s)

  5. What Systems Does IPMIS2.3 / 3.0 Run On? • Currently Supported and Tested on: • Microsoft Windows 95 • Microsoft Windows 98 • Microsoft Windows NT 4.0 • Microsoft Windows 2000 • Microsoft Windows XP Pro

  6. Features • Automatic and consistent calculation of Pounds of Active Ingredient (PAI) • Installation Inventory Tracking • Prepares detailed standardized reports and graphs of pest management activities • Ability to export data to standard format • Ability to produce pdf documents for all reports and graphs for easy distribution

  7. Features • Quick and Accurate retrieval of task information • Ability to attach images / documents to task records • Data validation for every entry • DoD Standardized Database in compliance with and registered with Defense Data Dictionary System (DDDS)

  8. Features • DITSCAP Certified • ACC Interim Certificate to Operate • ACC Interim Approval to Operate • On-line Bug Reporting – http://www.envirosoftinc.com/IPMIS.html • Help desk available by phone or e-mail with response within 24 hours

  9. Features Secure Login

  10. Features Easy Access Menus

  11. Features Easy Access Tools

  12. Features Standardized Look and Feel Input Screens

  13. Availability • Defense Environmental Network Information eXchange (DENIX) -http://www.denix.osd.mil • Armed Forces Pest Management Board http://www.afpmb.org

  14. Help Desk • helpdesk@envirosoftinc.com • 703-624-9144

  15. Completed Activities • IPMIS Roll-up – completed – Aug 02 • IPMIS 3.0 – completed – Nov 02 • IPMIS Translator – completed – Nov 02 • IPMIS 3.0 DITSCAP Certification – Nov 02 • IPMIS 3.0 Software Test Plan (STP) and Software Test Case Plan – completed – Dec 02 • Version 3.0 Tutorial – completed – Dec 02

  16. Completed Activities • IPMIS 2.3 Patch F –Mar 03 • IPMIS 2.3 DITSCAP Certification – Aug 03 • IPMIS 2.3 ACC Interim Certification to Operate –Oct 03 • IPMIS 3.0 Corrections • Incorporate NMCI Requirements • AEC Noted Errors • Completed October 31, 2003

  17. Current Activities • IPMIS Help Desk • IPMIS Version 3.0 • NMCI Certification • AEC Approval to Operate • ACC Approval to Operate

  18. Current Activities • On-site Testing and Evaluation • Army • Ft. Meade, Maryland • Ft. Belvoir, Virginia Coordinated with the Army Environmental Center (AEC) • Navy • Possible Candidates – • Washington NSY, Washington D.C. • Quantico MCB, Virginia Coordinated with the Navy Marine Corp Internet (NMCI)

  19. Current Activities • On-site Testing and Evaluation (Cont) • Air Force • Andrews AFB, Maryland • Langley AFB, Virginia Coordinated with the Command Entomologist • DLA • Possible Candidates – • Defense Supply Center Susquehanna (DSSC), Pennsylvania • Defense Supply Center Richmond, Virginia

  20. Current Activities • On-site Testing and Evaluation (Cont) • Start Date - As Soon As Possible Coordinated With Each Site • Onsite Assistance / Installation / Setup • Feedback With All Sites Via E-mail or DENIX Working Group • Updates to All Participants Via E-mail • Only to T&E Group Participants

  21. Future Activities • Palm Interface / Synchronization – Spring 2004 with Final Release - MobileVB Solo for PalmOS • Rollup Tool - ?

  22. Per Installation Activities • GIS Integration • Web Based Database Interface • Microsoft SQL Server • Oracle • Client Server Database • Microsoft SQL Server • Oracle

  23. Demonstration to Follow Committee MeetingThank You

More Related