An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. F-MAN Project – Final ReviewGenoa, December 2nd – 3rd, 2004 EDC HUB statistics Data relevance, SMS latencies, Power Consumption, Costs

  2. Architecture overview Archiving, logging, PARSING (Bin. <-> XML) XML SMS PDU (binary messages) 100111010111010101001010… SMTP (E-mail)

  3. Data relevance • 11498 messages handled (20040526102002 – 20041126090529 ) • Extracted data: • Host time (UTC)  reception of the SMS by the HUB. • OBT ID • OBT generation time (TX time - UTC)  time the OBT did send the SMS. • “User” (PI, SNCF, CP) • Message type (0x80, 0x82, 0x84, 0x90 …) • Power consumption • Position time • Event time (cfr. Excel file “all.xls”)

  4. Message latencies (1) • Host time (reception) – OBT generations time (send) • Restrictions: • Only (“single” record 0x84 messages); • Valid Position & Event times; • For PI OBT’s only (differences between CP, PI and SNCF OBT’s prove to be not significant); • 2850 records are useable data AVERAGE LATENCY: 2496 seconds (42 minutes) MEDIAN LATENCY: 63 seconds (cfr. All_d.xls)

  5. Message latencies (2)

  6. Energy consumption (1) • Calculation base: • Host time, OBT ID, energy consumption; • Battery capacity: PwrCpt maximum value = 4651; • Result per OBT; • PI & SNCF OBT’s; • Different setup (messages per day) for PI and SNCF; • Worst Case scenario calculations

  7. Energy consumption (2)SNCF • Based on data in “sncf_power.xls” • Maximum energy consumption per month = 85 units (approximately 1.83 %); • Average power units used = 500; • Energy units remaining: 4651 – 500 = 4151 • Months before alarm: 4151/85 = 48 months  (november 2008)

  8. SNCF energy consumption percentage graph

  9. Energy Consumption (3)PI • Based on data in “pi_power.xls” • Maximum energy consumption per month = 208 units (4.5 %); • Average power units used = 1000; • Power units remaining: 4651 – 1000 = 3651 • Months before alarm: 3651/208 = 17 months  (March/April 2006)

  10. PI energy consumption percentage graph

  11. SMS cost estimate • Calculation base (cfr. FMAN_SIM_sept.xls) • Mobistar billing details from May -> September 2004; • Total number of SMS messages PI: 4031; • Total number of SMS messages SNCF: 3589; • No billing data for CP available; CP does not use “EDC” SIM cards. SMS cost PI: € 0.36 SMS cost SNCF: € 0.35 Fixed fee for CP SIM cards: € 0.02  0.05

  12. Questions & Answers EDC whishes to thank Every member of the F-MAN team For the very constructive collaboration. EDC Heidestraat 257 B-2070 Zwijndrecht Belgium www.edchq.com, www.viasat.be