Undulator System Overview. Stephen Milton. Undulator Systems WBS 1.4. Undulator Hall Schematic Baseline Layout. LCLS Organization @ L2. Management: Organization. APS J.M. Gibson Assoc. Lab. Director. LCLS Undulator S. Milton Project Director. LCLS Project J. Galayda Project Director.
E N D
Undulator System Overview Stephen Milton
Management: Organization APS J.M. Gibson Assoc. Lab. Director LCLS Undulator S. Milton Project Director LCLS Project J. Galayda Project Director D. Walters Vacuum/Diagnostics CAM H.D. Nuhn Undulator System Physicist Accel. Systems. Div. R. Gerig Division Director Exp. Facilities Div. E. Gluskin Division Director M. White Magnet Systems CAM R.Ruland/MMF J. Welch/Fixed Support CAM APS Operations Div. W. Ruzicka Division Director J. Stein Controls CAM
Undulator: Prototype Status • Value Engineered Thoroughly • Most recently • Wingless poles • Aluminum magnet block/pole holder simplification • All measurement tested • Including before and after transporting
Acquisition/Delivery Plan • Undulators • Prototyped and Thoroughly Tested • Long-Lead Procurements • Ti Strongback • Magnet Blocks • Magnets Poles • 1st Article in industry before production run (FY05) • Assemble in industry • Deliver to SLAC MMF • Measure/tune at SLAC • Handover of responsibility to SLAC following successful tuning • Install
Undulator: Status of LLPs • Statement of Work • Complete for Ti stongback • Near complete for the poles and the magnet blocks • Federal Business Opportunities (FedBizOps) • Requests for interest released • Will be used to qualify vendors • See other’s talks for many more details
Continuing Resolution • ??? • For the purpose of this review don’t worry about it.