An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Document 12 Preparation Forum for WebSAMS Implementation 蓄勢待發, 迎WebSAMS Presented by Raymond LiTechnical Services Manager NCS

  2. Document 12 Agenda • Overview of Rollout Process Stage 1 – Readiness Check Stage 2 – School Preparation • Major Documents Stage 3 – Schedule Planning Stage 4 – WebSAMS Installation Stage 5 – Post-installation • The Support Services

  3. Stage 1 Stage 2 Stage 3 Stage 5 Readiness Check School Preparation Schedule Planning Post-installation Complete Outstanding Tasks  Collect & Prepare Related Information  • Readiness Assessment .HW & SW • Network • SAMS Stage 4 Ready to use !! Installation Data Conversion  SAMS  Training Document 12 Roll-out Process Overview - 5 Stages

  4. Document 12 Roll-out Process Overview Stage 1 Readiness Check

  5. HW & SW • Network • SAMS Document 12 Roll-out Process Overview - Stage 1 Readiness Check

  6. Document 12 Roll-out Process Overview - Stage 1 Readiness Check – HW & SW 2 Dedicated Servers - WebSAMS & HTTP Server WebSAMS Server • Mini HW Configure : P III 600 Mhz, 1GB RAM, 3 x 9 GB HD. • Windows 2000, Backup, Anti-Virus Software • Existing SAMS Server

  7. Document 12 Roll-out Process Overview - Stage 1 Readiness Check – HW & SW HTTP Server • PC class • P II 400 Mhz • 128 MB RAM • 4GB HD

  8. Document 12 Roll-out Process Overview - Stage 1 Readiness Check - Network Network Infrastructure Requirement for WebSAMS Rollout 1. The WebSAMS segment and the ITEd segment are separated by a router.

  9. Document 12 Roll-out Process Overview - Stage 1 Readiness Check - Network Network Infrastructure Requirement for WebSAMS Rollout 2. The Internet is separated from the school network by an Internet Gateway (IG).

  10. Document 12 Roll-out Process Overview - Stage 1 3. The IG should be configured to provide the following services: • IP packet filtering; and • Network Address Translation (NAT).

  11. Document 12 Roll-out Process Overview - Stage 1 4. The IG can be a: • Firewall with or without DMZ; • Proxy server; or • Router.

  12. Document 12 Roll-out Process Overview - Stage 1 5. The IG may be implemented by: • ISP; or • School

  13. ?? Document 12 Roll-out Process Overview - Stage 1 A Common Fault No IG !! Mix of Internet & Intranet => Security Exposure

  14. Document 12 Roll-out Process Overview - Stage 1 SAMS Readiness • SAMS version 4.4 & CDS 4.1 • Restore archive data from tapes • Update Chinese fonts with HKSCS Big5 codes

  15. Document 12 Roll-out Process Overview Stage 2 School Preparation

  16. Complete Outstanding Tasks • Collect and Prepare the Required Information • Data Conversion SAMS • Training Document 12 Roll-out Process Overview - Stage 2 School Preparation

  17. Document 12 Roll-out Process Overview - Stage 2 Complete Outstanding Tasks • HW & SW • Network • SAMS

  18. Document 12 Roll-out Process Overview - Stage 2 Network Preparation • NAT port mapping for Internet Gateway • ONE-TO-ONE mapping of TCP port 80, 443, and 7010 (for training system). Public (Internet) IP address for WebSAMS's Linux HTTP server & Private (Internal) IP address for WebSAMS's Linux HTTP server For examples 202.82.18.180 TCP 80 -> 10.64.128.25 TCP 80 202.82.18.180 TCP 443 -> 10.64.128.25 TCP 443 202.82.18.180 TCP 7010 -> 10.64.128.25 TCP 7010 • WebSAMS server (e.g. 10.64.143.150) can access to Internet directly WITHOUT using a proxy server The validity will be confirmed by EMB’s contractor before rollout

  19. Document 12 Roll-out Process Overview - Stage 2 Network Preparation Get ready the WebSAMS URL (Convention: websams.schoolabc.edu.hk) • Request ISP to include the DNS entry of WebSMS URL for Internet access • For EMB to generate the digital certificate which is necessary for CDS

  20. Document 12 Roll-out Process Overview - Stage 2 Collect & Prepare Related Information • to be facilitated by Forms collection • WebSAMS Installation Readiness Checklist (Form 2) – to be ready 1 week after the Preparation Forum • Information Required Before WebSAMS Installation (Form 1) • Action List for WebSAMS Implementation (Doc 2e)   

  21. Form 1 Form 2 NAT Mapping WebSAMS URL Perform Data Conversion Document 12 Roll-out Process Overview - Stage 2 All in All Immediate information to kick start the rollout preparation • Basic school contact information (e-mail, mobile), through Form 1 & 2 • Confirm the tentative rollout date – for prioritization purpose. EMB’s contractor will follow up. • Network diagram (Form 2) • NAT mapping, ASAP by school • WebSAMS URL application (Form 2) – ASAP by school • Perform data conversion – with the DCV kit can proceed right away.

  22. SAMS Document 12 Roll-out Process Overview - Stage 2 Data Conversion • Data Conversion Kit

  23. Document 12 Roll-out Process Overview - Stage 2 Training • 5 full days comprehensive training

  24. Document 12 Roll-out Process Overview Stage 3 Schedule Planning

  25. Document 12 Roll-out Process Overview - Stage 3 Schedule Planning • Fix the rollout date with EMB’s contractor • Take into consideration of Data Conversion (at least 1 wk before rollout date) • Practice before data conversion Planning Timing

  26. DCV Trial Run Freeze point System checkup Pre- validation Data Conversion Post- validation Pre- validation Data Conversion Post- validation System Checkup Iterative Iterative 2 days System Roll Out Estimate 7 days Document 12 Roll-out Process Overview - Stage 3 Dependencies of Rollout date planning

  27. Document 12 Roll-out Process Overview Stage 4 WebSAMS Installation

  28. Document 12 Roll-out Process Overview - Stage 4 WebSAMS Installation • EMB’s contractor - WebSAMS installation • Installation of WebSAMS server • Installation of HTTP server • Network configuration • Upload converted SAMS data • Handover documentation, software license, account & password • Schools • Immediate – Conduct installation test cases • W/i 3 mandays – Sign-off data conversion acceptance • W/i 3 mandays - Sign-off installation acceptance • After 1 month – Sign-off reliability test

  29. Document 12 Roll-out Process Overview Stage 5 Post-installation

  30. Document 12 Roll-out Process Overview - Stage 5 Post-installation • Send the WebSAMS version number via CDS message to EMB • Change WebSAMS account passwords • Assign WebSAMS initial access right • Modify PC configuration • Routine Security Check • Routine System Backup

  31. Document 12 Support Services Hotline Services from EMB’s contractor • Tel : 3125-8510 • E-mail : websams_support@hk.ncs-i.com • Fax : 3125-8999 EMB Contact – websams_rollout@emb.gov.hk Service Hours - Mon-Fri : 8:30 am - 5:30 pm ; Sat : 8:30 am - 12:00 noon Scope of Services • Pre-installation support • School Preparation • Data Conversion • Administration (e.g. Schedule installation appointment) • Post-installation support • Installation • Technical

  32. http://www.hkedcity.net/iworld/resources/cabinet.phtml?iclub_id=105&tool_id=105http://www.hkedcity.net/iworld/resources/cabinet.phtml?iclub_id=105&tool_id=105 Document 12 Support Services • 5 full days comprehensive training • Web resources – www.hkedcity.net

  33. Document 12

More Related