Status of Cryomodule-A for S1-Global at KEK

Status of Cryomodule-A for S1-Global at KEK. Eiji Kako (KEK, Japan). Schedule: String Assembly of KEK Cavities. Mar. 01 ~ ; class-10 clean room String assembly of 4 KEK cavities Pumping and Leak check Ar gas slow leak up to 1 atm Mar. 08 ~ ; outside of clean room

sheryl
Download Presentation

Status of Cryomodule-A for S1-Global at KEK

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan) Webex meeting S1-G Global Design Effort

  2. Schedule: String Assembly of KEK Cavities Mar. 01 ~ ; class-10 clean room String assembly of 4 KEK cavities Pumping and Leak check Ar gas slow leak up to 1 atm Mar. 08 ~ ; outside of clean room Slide-Jack tuner assembly Tuner drive check Align. of 4 cavities Mar. 15 ~ ; outside of clean room RF meas. (fo, Qext, Tuner stroke) Webex meeting S1-G Global Design Effort

  3. Completed String Assembly of KEK cavities MHI-05 5th, March 2010’ MHI-06 MHI-07 MHI-09 Class-10 Clean Room Webex meeting S1-G Global Design Effort

  4. Outside of Clean Room Memorial Photo (8th, Mar. 2010’) Photo by Toge-san Webex meeting S1-G Global Design Effort

  5. Slide-Jack Tuner Assembly 9th, March 2010’ MHI-06 MHI-05 Webex meeting S1-G Global Design Effort

  6. Preparation for Warm Coupler Assembly Tools and Jigs for warm coupler assembly from DESY 2 Warm Couplers from DESY 2 Warm Couplers from FNAL/SLAC Webex meeting S1-G Global Design Effort

  7. Schedule of Warm Coupler Assembly 15 Mon ; am. ILC meeting pm. STF Cav. Meeting (Installation of Cryomodule-C in Tunnel) Arrival of Denis Kostin from DESY 16 Tue ; am. Meeting for Warm coupl. Assem. @ STF pm. Check &Preparation of Coupler Parts Set-up of Clean-booth & Pumping system nightWelcome Party 17 Wed ; am./pm. Assembly of Warm Coupler (Z109) 18 Thu ; am./ pm. Assembly of Warm Coupler (Z108) 19 Fri ;am./ pm. Assembly of Warm Coupler (ACC011) 20 Sat ; am./ pm. Assembly of Warm Coupler (AES004) Webex meeting S1-G Global Design Effort

  8. Connection of Beam Pipefor Cryomodule-C 22 Mon ; National Holiday 23 Tue ; am. Preparation and Set-up of Clean Booth pm. Cleaning, Rinsing, HPR, Dry of Beam pipe for Cryomodule-C 24 Wed ; am. Connection of Beam pipe (Endplate) pm. Pumping & Leak check Movement of Clean Booth 25 Thu ; am. Go to Beijing 26 Fri ;am./ pm. GDE@Beijing Webex meeting S1-G Global Design Effort