1 / 22

Indian instutute of technology , bombay design cell

Overview of completed projects in August 2015 by the Design Cell at Indian Institute of Technology Bombay, including details on various renovations, labs, and office spaces.

sison
Download Presentation

Indian instutute of technology , bombay design cell

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Major projects carried out by Design cell ( July 2015 ) Indian instutute of technology , bombaydesign cell Design cell IIT,BombayAug 2015

  2. Works completed Aug 2015 ( Design cell ) Design cell IIT,Bombay Aug 2015

  3. Research Park Main Building Ground FloorArea = 600 sqftYear = July 2015Project Duration = 2 MonthsProject Cost = 16 lakhsRate Per Sqft = 2700 per sqftWork taken up = Civil, interior, electrical furniture & Chairs Design cell IIT,BombayAug 2015

  4. CEP Office ( Main Bldg 2nd floor )Area = 1200 sqftYear = Aug 2015Project Duration = 4 MonthProject cost = 23.0 lakhsRate per Sqft = 1900 per sqftWork Taken up = Interior, furniture & Electrical Design cell IIT,BombayAug 2015

  5. Prof.Rajaraman’s PHD Lab Chemical Eng. DeptArea = 425 Sq.ftYear = August 2015Project Duration = 2 monthsProject Cost = 10.0 lakhsWork taken up = Civil, Electrical & Furniture Design cell IIT,BombayAug 2015

  6. RS Lab Metallurgy Dept.3rd FloorArea = 400 sqftYear = August 2015Project Duration = 2 monthsProject Cost = 8.0 lakhswork Taken up = Civil,Interior,furniture & Electrical Design cell IIT,BombayAug 2015

  7. Works in Progress till Aug 2015 ( Through Architect) ) Design cell IIT,Bombay Nov 2013

  8. Bio Lab ( Chemical Dept )Area = 4500 sqftProject Duration = 4 MonthsProject Cost = 50 lakhsProject Statue = 100 % completeWork taken up = Civil, interior, electrical furniture Design cell IIT,BombayAug 2015

  9. CTARA students lab ( old computer science bldg ) Phase-1Area = 650 sqftProject Duration = 6 MonthProject cost = 40.00 lakhsProject Statue = 95 % completeWork Taken up = Interior, furniture & Electrical Design cell IIT,BombayAug 2015

  10. Electrical Dept RenovationArea = 8500 sqft Completion Period = 9 monthsProject Status = 95% completedProject cost = 85 lakhsWork taken up = Interior work Design cell IIT,BombayAug 2015

  11. Nano (Electrical Annex) Design cell IIT,BombayAug 2015

  12. Electrical Engineering Dept Lobby Design cell IIT,BombayAug 2015

  13. Civil Dept General space RenovationArea = 6000 sqftCompletion period = 9 monthsProject cost = 1.30 croresStatus = 60% completeWork taken up = Interior , furniture, Electrical Design cell IIT,BombayAug 2015

  14. Architect Projects to start by Sep 2015 Design cell IIT,Bombay Aug 2015

  15. Gulmohar Renovation ( Phase -1 ) Garden Restaurant , Kitchen and Terrace Area = 7000 sqftProject Duration = 6 MonthProject cost = 2.5 crores Work Taken up = Civil, Interior, Furniture , landscaping & Electrical Design cell IIT,BombayAug 2015

  16. Façade Renovation for Electrical, CivilMechanical, Metallurgy & Physics Dept.Project Duration = 12 monthsProject cost = 2.00 crores Design cell IIT,BombayAug 2015

  17. Aero Dept Renovation ( Main and Annex ) Project Duration = 2 years ( will be done in phases )Project cost = 6.00 croresWork Taken up = Civil, Interior, Furniture & Electrical Design cell IIT,BombayAug 2015

  18. Mechanical Engineering Dept Renovation Area = 10000 sqftProject Duration = 2 years ( Work will be carried out in phases )Project cost = 5.00 croresWork Taken up = Interior, furniture, electrical Design cell IIT,BombayAug 15

  19. Jal vihar and Vanvihar Rooms renovation .Project Duration = 1 years ( will be done in phases )Project cost = 6.00 croresWork Taken up = Civil, Interior, Furniture, Electrical and HVAC Mock up Room ( Jalvihar ) 16 rooms Mock up Room ( vanvihar ) 50 rooms Design cell IIT,BombayAug 2015

  20. Design cell IIT,BombayAug 2015

  21. Design cell IIT,BombayAug 2015

  22. Thank you Design cell IIT,Bombay Nov 2013

More Related