An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MencapaiSasaranTahun 2014Bidang Pembangkit Lampung, 8 Januari 2013 Ishvandono Yunaini A

  2. KebijakanStrategis 2014 • MenjagaKecukupanPasokanPembangkit • MenjagaKecukupan& KeandalanJaringanTransmisi • MenjagaKeandalanTrafo & Penyulang • MencapaiEfisiensiCAPEX & OPEX • Mewujudkan Proses BisnisEkselen • MeningkatkanIntegritas Data , Integritas Personal dan Leadership

  3. Issue Strategis • TanggapanDekomatas LM TW II • TanggapanDekomatas LM TW III

  4. Issue Strategis, lanjutan…. • HasilDekombulanNopember 2013 • Target pemakaian BBM (HSD+MFO) = 2,7 juta KL dan Biofuel = 650 rb KL

  5. NERACA DAYA SBST 2014 (NORMAL) PLTU Gunung Sugih 2x7 MW PLTU Sebalang#2 100 MW PLTMG sei Gelam 50 MW PLTMG Sewa Keramasan 50 MW PLTU Teluk Sirih#2 100 MW PLTMG Sei Gelam 30 MW PLTMG Sewa T. Lembu 30MW PLTMG Duri#6 14 MW PLTU Sebalang#1 100 MW PLTMG Sewa T.Lembu 60 MW PLTU Banjar Sari#1 110 MW PLTMG Sewa TLMBU PJBS 15 MW PLTMG Sewa TLMBU PJBS 15 MW PLTU Teluk Sirih#1 100 MW PLTMG Sewa TLMBU50 MW PLTD Sewa GDSKT 50 MW Cadangan Tertinggi :493 MW Cadangan Terendah :-219 MW Cadangan Rata-rata : 68 MW BP 2013 = 2760 MW; BP 2014 = 3173 MW, tumbuh15% (414 MW)

  6. Deviasi : 2.906.394 MWh

  7. Growth vs Pembangkit Baru 10% Peningkatan Penjualan 2.906.394 MWh Pembangkit Baru 690,5 MW Produksi Netto pada CF 60% 3.258.883 MWh Produksi Netto 3.197.033 MWh 10% • Proyekselesaitepatwaktu • CF Pembangkit Baru minimum 60%  EAF :75% • Pembangkit existing tetap dioperasikan • Pembangkit BBM tetap dioperasikan • Pembangkit BBG, bila gas tidak tersedia maka • dioperasikan dengan BBM • Kebutuhan BBM dalam penyusunan RKAP disesuaikan

  8. Perhitungan Subsidi Listrik Tahun 2014 7,3 6,2 4,8

  9. Terimakasih