An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E-SURFMAR Programme Status & TT-AWS Report 20th PB-Obs meeting 5-6th October 2009, Offenbach Pierre Blouch E-SURFMAR Programme Manager 20th PB-OBS Meeting, 5-6 Sept. 2009 Pierre Blouch, E-SURFMAR Programme Manager

  2. Contents • 1. Network status • 2. Ongoing activities and plans 20th PB-OBS Meeting, 5-6 Sept. 2009 Pierre Blouch, E-SURFMAR Programme Manager

  3. Contents • 1. Network status • 2. Ongoing activities and plans 20th PB-OBS Meeting, 5-6 Sept. 2009 Pierre Blouch, E-SURFMAR Programme Manager

  4. Iridium SVP-B Argos SVP-B SVP-BW (moored buoys) Programme Drifting Buoys August 2009 20th PB-OBS Meeting, 5-6 Sept. 2009 Pierre Blouch, E-SURFMAR Programme Manager

  5. Drifting Buoys Data Timeliness Number of operating buoys E-SURFMAR EGOS Long term target : 90% E-SURFMAR Short term target : 70% EGOS Percentage of reports sent onto theGTS less than 50 minutes after the observation 20th PB-OBS Meeting, 5-6 Sept. 2009 Pierre Blouch, E-SURFMAR Programme Manager

  6. Arctic & North Drifting Buoys Supplementary Eumetnet buoys Non-Eumetnet buoys August 2009 20th PB-OBS Meeting, 5-6 Sept. 2009 Pierre Blouch, E-SURFMAR Programme Manager

  7. VOS Observations Data AvailabilityAverage number of daily reportsfrom the EUCOS area E-SURFMAR Target : 1000 obs/day E-SURFMAR Target : 250 obs/day Conventional VOS Automated VOS (AWS) 20th PB-OBS Meeting, 5-6 Sept. 2009 Pierre Blouch, E-SURFMAR Programme Manager

  8. Funded AWS 20th PB-OBS Meeting, 5-6 Sept. 2009 Pierre Blouch, E-SURFMAR Programme Manager

  9. Moored Buoys EUCOSmoored buoys • The four EUCOS moored buoys were nominally in operation over the past two months. • K5 still reports directional wave spectra observations through Iridium for valuation (no spectra reported onto the GTS). • Areference waverider would be desirable for calibration (DB-TAG request). The use of ~50 k€ from E-SURFMAR savings was proposed. The project was removed from the revised EUCOS budget. 20th PB-OBS Meeting, 5-6 Sept. 2009 Pierre Blouch, E-SURFMAR Programme Manager

  10. Performances (September 2009) 20th PB-OBS Meeting, 5-6 Sept. 2009 Pierre Blouch, E-SURFMAR Programme Manager

  11. Contents • 1. Network status • 2. Ongoing activities and plans 20th PB-OBS Meeting, 5-6 Sept. 2009 Pierre Blouch, E-SURFMAR Programme Manager

  12. Other activities and plans • Surface marine OSE conducted by ECMWF (period: 7 weeks over last winter). Results expected in next december/january. • Works on an AIS weather report dataformat in the frame of the e-navigation (collaboration with a correspondence group of IMO on AIS binary messages). These reports could become the equivalent of AMDAR for ships. • Search for voluntary ships to be equipped with BaRos stations in the Medit. Sea is becomming a priority for E-SURFMAR. Possible co-operation with oceanographers in the frame of HyMeX (first IOP in 2001-2012) andMOON (Medit. Operational Oceanography Network). • Preparation of a workshop for PMOs in Antwerp (2-4 december 2009). Programme : use of the Pub 47 metadata database and QC tools, S-AWS installations (including a real exercice on a ship). 20th PB-OBS Meeting, 5-6 Sept. 2009 Pierre Blouch, E-SURFMAR Programme Manager

  13. Questions ? 20th PB-OBS Meeting, 5-6 Sept. 2009 Pierre Blouch, E-SURFMAR Programme Manager www.free-stockphotos.com