220 likes | 357 Views
General Overview of Work Program ISO/TC 20/SC 14 Joint SC 13-SC 14 Meeting. 23 May 2011 DIN Headquarters Berlin, Germany. ISO/TC 20/SC 14: Space Systems and Operations. Established in 1993 Chairman: Larry Schultz (US) Six working groups and one coordination group
E N D
General Overview of Work Program ISO/TC 20/SC 14Joint SC 13-SC 14 Meeting 23 May 2011 DIN Headquarters Berlin, Germany
ISO/TC 20/SC 14: Space Systems and Operations • Established in 1993 • Chairman: Larry Schultz (US) • Six working groups and one coordination group • WG1: Design Engineering & Production [Convener: Keiichiro Eishima (Japan)] • WG2: Interfaces, Integration & Testing [Convener: Bill Raynor (US)] • WG3: Operations & Ground Support [Convener: Dave Finkleman (US)] • WG4: Space Environments [Convener: Mikhail Panasyuk (Russia)] • WG5: Program Management & Quality [Convener: Severin Drogoul (France)] • WG6: Materials & Processes [Convener: David Hirsch (US)] • Orbital Debris Coordination Working Group [Convener: John Davey (UK)] • Published Documents: 89 • Active Projects: 48
Membership • Participating Members (14) • Brazil, Canada, China, France, Germany, India, Israel, Italy, Japan, Kazakhstan, Russia, United Kingdom, United States, Ukraine • Observing Members (6) • Argentina, Republic of Korea, Poland, Slovakia, Sweden • Liaisons (7) • ASD-STAN, CCSDS, COSPAR, ECSS, ESA, IAA, WCO
Working Group 1 – Design Engineering and Production • Published Documents: • 14302: Electromagnetic compatibility requirements • 14621-1: Electrical, electronic, and electromagnetic (EEE) parts - Parts management • 14621-2: Electrical, electronic, and electromagnetic (EEE) parts - Control program requirements • 14622: Structural design - Loads and induced environment • 14623: Pressure vessels and pressurized structures - Design and operation • 14953: Structural design - Determination of loading levels for a static qualification test of launch vehicles • 14954: Exchange of mathematical models for dynamic and static analysis • 15387: Single-junction solar cells - Measurements and calibration procedures
Working Group 1 – Design Engineering (cont’d) • Published Documents: • 16454: Structural design - Stress analysis requirements • 21347: Structural design - Fracture and damage control for spaceflight structures • 21648: Flywheel module design and test • 22010: Mass properties control • 23038: Space solar cells - Electron and proton irradiation test methods • 24637: Electromagnetic interference (EMI) test reporting requirements • 24638: Pressure components and pressure system integration • Active Projects: • 10785: Bellows - Design and operation • 10786: Structural components and assemblies
Working Group 1 – Design Engineering (cont’d) • Active Projects (cont’d): • 11221: Space solar panels - Spacecraft charging induced electrostatic discharge test methods • 16126: Survivability of unmanned spacecraft against space debris and meteoroid impact – Risk assessment • 16127: Prevention of break-up of unmanned spacecraft • 16781: Simulation requirements for control system • 26871: Explosive systems and devices
Working Group 2 – Interfaces, Integration, and Testing • Published Documents: • 14303: Spacecraft to launch vehicle interfaces • 15862: LV-SC flight environment requirements for telemetry data processing • 15863: Spacecraft to launch vehicle interface control document • 15864: General test standard for spacecraft, subsystems, and units • 17401: Spacecraft interface requirements document for launch services • 19933: Format for spacecraft launch environmental test report • 24917: General test requirements for launch vehicles • Active Projects: • 10784-1: Early operations - Part 1: Initialization and commissioning • 10784-2: Early operations - Part 2: Initialization plan • 10784-3: Early operations - Part 3: Commissioning report
Working Group 2 – Interfaces (cont’d) • Active Projects (cont’d): • 11892: Subsystems/units to spacecraft interface control document • 16694: The measured parameters at firing bench and flight tests of liquid rocket engines • 17566: General test documentation • 26869: Small auxiliary spacecraft (SASC) to launch vehicle interface control document
Working Group 3 – Operations and Ground Support • Published Documents: • 14619: Space experiments - General requirements • 14620-1: Safety requirements - Part 1: System safety • 14620-3: Safety requirements - Part 3: Flight safety systems • 14625: Ground support equipment for use at launch, landing, or retrieval sites - General requirements • 14711: Unmanned mission operations concepts - Guidelines • 14950: Unmanned spacecraft operability • 15389: Flight to ground umbilicals • 15860: Gas contamination - Measurements methods for field tests • 16458: Unmanned spacecraft transportation • 17399: Man-systems integration • 17400: Launch and integration site general test requirements
Working Group 3 – Operations (cont’d) • Published Documents (cont’d): • 22108: Non-flight items in flight hardware - Identification and control • 23041: Unmanned spacecraft operational procedures – Documentation • 23339: Unmanned spacecraft residual propellant mass estimation for disposal manoeuvres • 26870: Launch pad and integration site operational documents • 26872: Disposal of satellites operating at geosynchronous altitude • 27875: Re-entry safety control for unmanned spacecraft and launch vehicle orbital stages • Active Projects: • 11233: Orbit determination and estimation - Process for describing techniques • 14620-2: Safety requirements - Part 2: Launch site operations
Working Group 3 – Operations (cont’d) • Active Projects (cont’d): • 16158: Avoiding collisions with orbiting objects • 16159: Launch pad and integration site - Analysis of failures • 16164: Disposal of satellites operating in or crossing Low Earth Orbit • 16699: Disposal of orbital launch stages • 24113: Orbital debris, routes to compliance and management for debris mitigation • 26900: Orbit data messages • 27852: Orbit lifetime estimation
Working Group 4 – Space Environment • Published Documents: • 15390: Models of galactic cosmic rays • 15856: Space environment - Simulation guidelines for radiation exposure of non-metallic materials • 16457: Earth's ionosphere and plasmasphere • 21348: Space environments - Solar irradiance determinations • 22009: Model of Earth's magnetospheric magnetic field • Active Projects: • 10788: Lunar dust simulant • 11225: Space environment (natural and artificial) - Guide to reference and standard atmosphere models • 12077: Space environment (natural and aritificial) - Trapped electron flux model for Geostationary Earth Orbits (GEO)
Working Group 4 – Space Environment (cont’d) • Active Projects (cont’d): • 12208: Observed proton fluences over long duration at GEO and Guideline for selection of confidence level in statistical model of solar proton fluences • 14200: Guide to process - based implementation of meteoroid and debris environmental models (orbital altitudes below GEO+2000km) • 14222: Space environment (natural and artificial) - Earth atmosphere density above 120 km • 16695: Earth's internal magnetic reference field models • 16698: Methods for estimation of future geomagnetic activity • 16709: Realtime solar activity and space environment information for spacecraft operation
Working Group 5 – Program Management and Quality • Published Documents: • 11231: Probabilistic Risk Assessment (PRA) • 15865: Qualification assessment • 16091: Integrated logistic support • 16192: Lessons learned - Principles and rules • 17666: Program Management - Risk management • 21349: Project reviews • 21350: Use of off-the-shelf items in new flight applications • 21351: Functional and technical specifications • 23460: Programme management - Dependability assurance requirements • 23461: Programme management - Non conformance control system • 23462: Guidelines to define the management framework for a space project
Working Group 5 – Program Management (cont’d) • Published Documents (cont’d): • 27025: Programme management - Quality assurance requirements • 27026: Programme management - Project breakdown structures • Active Projects: • 10789: Programme management- Information and documentation management • 10794: Programme management - Material, mechanical parts and processes • 10795: Programme management - Glossary of terms • 11893: Programme management - Project organization • 14300-1: Program management • 14300-2: Product assurance - policy and principles
Working Group 5 – Program Management (cont’d) • Active Projects: • 16290: Definition of the Technology Readiness Levels (TRL) and their criteria of assessment • 16404: Programme management - Requirements management
Working Group 6 – Materials and Processes • Published Documents: • 14624-1: Safety and compatibility of materials - Part 1: Test method for upward flammability of materials • 14624-2: Part 2: Test method for electrical wires and accessories • 14624-3: Part 3: Test method for off-gassed products from materials and assembled articles • 14624-4: Part 4: Test method for flammability of materials in gaseous oxygen • 14624-5: Part 5: Test method for determination of the reactivity of materials with aerospace hypergolic propellants • 14624-6: Part 6: Test method for determining the reactivity of processing materials with aerospace fluids • 14624-7: Part 7: Test method for determining the permeability and penetration of materials to aerospace fluids
Working Group 6 – Materials and Processes (cont’d) • Published Documents (cont’d): • 14952-1: Surface cleanliness of fluid systems - Part 1: Vocabulary • 14952-2: Part 2: Cleanliness levels • 14952-3: Part 3: Analytical procedures for the determination of non volatile residues and particulate contamination • 14952-4: Part 4: Rough cleaning processes • 14952-5: Part 5: Processes for drying equipment • 14952-6: Part 6: Precision cleaning processes • 15859-1: Fluid sampling and test methods - Part 1: Oxygen • 15859-2: Part 2: Hydrogen propellant • 15859-3: Part 3: Nitrogen • 15859-4: Part 4: Helium propellant • 15859-5: Part 5: Nitrogen tetroxide propellant
Working Group 6 – Materials and Processes (cont’d) • Published Documents (cont’d): • 15859-6: Part 6: Monomethylhydrazine propellant • 15859-7: Part 7: Hydrazine propellant • 15859-8: Part 8: Kerosene propellant • 15859-9: Part 9: Argon • 15859-10: Part 10: Water • 15859-11: Part 11: Ammonia • 15859-12: Part 12: Carbon dioxide • 15859-13: Part 13: Breathing air • 22538-1: Oxygen safety - Part 1: Hazards analysis for oxygen components and systems • 22538-2: Part 2: Selection of metallic materials for oxygen components and systems
Working Group 6 – Materials and Processes (cont’d) • Published Documents (cont’d): • 22538-3: Part 3: Selection of non-metallic materials for oxygen components and systems • 22538-4: Part 4: Design of oxygen components and systems • 22538-5: Part 5: Operational and emergency procedures • 22538-6: Part 6: Facility planning and implementation • Active Projects: • 10830: Non-destructive testing - Method of automatic ultrasonic inspection of graphite ingot for solid rocket motor • 11227: Test procedure to evaluate spacecraft material ejecta upon hypervelocity impact • 15388: Contamination and cleanliness control
Working Group 6 – Materials and Processes (cont’d) • Active Projects (cont’d): • 16157: Man-system integration standards - Techno-medical requirements for space vehicle crew habitation environments • 16378: Measurements of thermo-optical properties of thermal control materials • 16691: Thermal control coatings for satellites and spacecraft - General requirements • 16697: Safety and compatibility of materials - Method to determine the flammability thresholds of materials • 16726: Man-system integration standards — Techno-medical requirements for space vehicle crew habitation environments — Requirements to air quality affected by harmful chemical contaminants