1 / 8

Il gruppo CDF – Trieste/Udine

Il gruppo CDF – Trieste/Udine. Udine:D. Cauz, M. P. Giordani, G. Pauletta, M. Rossi, L. Santi. Trieste: S.Belforte, Casarsa, A. Penzo, A. Zanetti. Contributi H/W : I calorimetri Plug I riveltori a muoni Il SVT Il CPR. I Rivelatori a Muoni

taima
Download Presentation

Il gruppo CDF – Trieste/Udine

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Il gruppo CDF – Trieste/Udine Udine:D. Cauz, M. P. Giordani, G. Pauletta, M. Rossi, L. Santi Trieste: S.Belforte, Casarsa, A. Penzo, A. Zanetti • Contributi H/W : • I calorimetri Plug • I riveltori a muoni • Il SVT • Il CPR

  2. I Rivelatori a Muoni Udine/Trieste: D. Cauz, G.Pauletta, A.Penzo, L.,Santi, H.Grassman hanno collaborato assieme a Pisa, Dubna e Roma a: • Il completamento della copertura centrale(CSP) e l’estensione di quella in avanti fino a |h| = 1.5 (BSU) (800 nuovi scintillatori) • Il recupero dei CSP esistenti sulle pareti CSP/CMP BSU CSX/CMX IMU • Contributo di Udine/Trieste: • R&D (Udine:Cauz,Pauletta,Santi) • Test fototubi (Grassman) • Assemblaggio (Udine:Pauletta,Santi, Ts:Penzo) • Coordinazione del progetto (Udine: Pauletta) TSU CMU CMX Mini Skirt

  3. Status: • le efficienze dei nuovi contatori (CSP e BSU) rimangono buone • La deteriorazione di quelli vecchi (CSP pareti e CSX) continua ma rimangono utili • Solo i CSX vengono, per ora, utilizzati a livello di trigger. • Si sta’ lavorando per includere i nuovi scintillatori in avanti ( BSU) nel trigger A questo fine si indaga sulla possibilita’ di aggiungere un altra corolla di rivelatori tra toroidi ( a complemento dei TSU)

  4. CDF PLUG Calorimeters • UDINE: D.Cauz, G. Pauletta, L.Santi • R&D per i nuovi calorimetri a tegole scintillanti • Sviluppo e costruzione del sistema di monitoraggio e calibrazione Scintillating tile calorimeter Scintillating tiles form projective towers Laser monitoring scheme for each plug Nitrogen Laser (one per plug) 100 m quartz fiber 120 fibres feed Cal amd Smax PMTs pmt Secondary distributor particelle Primary distributor feeds 12 secondary distributors Fibre dalle tegole “decoder” boxes

  5. PMT/pin ratios averaged over all phi towers Eta tower 12 <Pm/pin ratio> normalized to first run • Il sistema di calibrazione e monitoraggio e’ servito a mettere in evidenza il deterioramento nel guadagno dei fototubi. Eta tower 17 Time in days • e’ attualmente indispensabile per seguire l’andamento dei guadagni e quindi la calibrazione dei calorimetri.

  6. Silicon Vertex Traker (TRIESTE -S.Belforte, A.M.Zanetti) • Ricordo il nostropassato remoto: • Definizione e sviluppo del progettoSVT fin dal TDR (1993) • Costruzione: progettazione e produzione Merger (~40 schede VME)  conoscenze e esperienza di valore: richiesta a tutt’oggi in vita quotidiana SVT • Responsabilita’ attualeelavori recenti: • “Manutenzione” SVT= molto piu’ che riparazioni: sistema “vivo”in continua evoluzione ed adattamento ai bisogni • ~40% delle schede di tutto SVT(Hit Buffer,Merger,AMS: maintenance, miglioramenti e upgrade funzionalita’) • Online software framework comune per interfaccia del software alto livello con tutte le schede SVT. • Problema timing SVT e L2: • modifiche per ridurre il tempo di esecuzione SVT e per implementare nuovi algoritmi (coinvolto AMS,Merger). • SVT Bypass (2004): ideata e realizzata nuova scheda (firmware Merger) per completo bypass SVT se da bit L1 so che SVT non usato in trigger. • Prossimo futuro: upgrade di SVTliberera’ Belforte da responsabilita’ di HB e AMS. Resta Merger e Bypass(Zanetti), software interfaccia schede (Belforte).

  7. 2004: Preshower/Crack UpgradeANL, Pisa, Roma,JINR, Kyungpook, Michigan, Rockerfeller, TsukubaTrieste: A. Penzo + techsUdine: G.Pauletta, D.Cauz, M.P. Giordani Previous CPR/CCR: Gas detector; proportional chambers --- slow response New CPR: scintillator pad detectors Preshower Detector (CPR) • 24x2 Wedges Crack Detector (CCR) CPR Tile

  8. Pulse height distribution from cosmic ray data from 54 tiles in top wedge. Summary • CPR + CCR are both functioning well • Sudy + Calibration done • Data taking ongoing • We have ~5 spare CPR modules • Overall project spent 15% of contingency 10 counts = 1 pe/MIP with PMT gain of 106, light yield well above spec. of 5 pe/MIP.

More Related