1 / 16

Strategically located on the 101 of the Allandale interchange Secure Business Estate

Strategically located on the 101 of the Allandale interchange Secure Business Estate Contemporary modern design Flexible design options Power secured Energy efficient initiatives Pumps & tanks reticulation provided Ample yard reticulation & parking.

tamar
Download Presentation

Strategically located on the 101 of the Allandale interchange Secure Business Estate

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Strategically located on the 101 of the Allandale interchange • Secure Business Estate • Contemporary modern design • Flexible design options • Power secured • Energy efficient initiatives • Pumps & tanks reticulation provided • Ample yard reticulation & parking PROJECT INFORMATION PAGE

  2. PAGEDESCRIPTION 1 - Macro Locality map 2 - Macro Google map 3 - Massing model - Stand 517 (Building 1 & 2) 4 - Siteplan – Stand 517 (Building 1 & 2) 5 - Artists Impression 1 6 - Artists Impression 2 7 - Building 1 – Ground floor Warehouse plan 8 - Building 1 – Ground floor Office plan 9 - Building 1 – First floor Office plan 10 - Revit Perspective 1 11 - Revit Perspective 2 12 - Energy Efficiency Initiatives 13 - Contacts page CONTENTS PAGE

  3. Back to contents page MACRO LOCALITY MAP

  4. Back to contents page MACRO GOOGLE MAP

  5. Back to contents page MASSING MODEL STAND 517 (Building 1 & 2)

  6. Back to contents page SITEPLAN BUILDING 1 & 2

  7. Back to contents page ARTISTS IMPRESSION 1

  8. Back to contents page ARTISTS IMPRESSION 2

  9. Back to contents page BUILDING 1 GROUND FLOOR WAREHOUSE PLAN

  10. Back to contents page BUILDING 1 GROUND FLOOR OFFICE PLAN

  11. Back to contents page BUILDING 1 FIRST FLOOR OFFICE PLAN

  12. Back to contents page REVIT PERSPECTIVE 1

  13. Back to contents page REVIT PERSPECTIVE 2

  14. Back to contents page • Additional features are offered to our clients upon request: • Structure • Upgrading of roof insulation • Double glazing to office areas and specific sun – control • Wet Services • Waterless urinals • Grey water re-use devices and rain water harvesting • Electrical • Lighting control and LED technology (sensors in offices, boardrooms, • and production facility) • Power factor correction (production environment) • Mechanical • VRV Air-conditioning system (Variable Refrigerant Volume) • Energy and Facility Efficiency Initiatives • Growthpoint shows total commitment towards energy efficiency. • We offer our clients the following standard specifications for the • long term benefit of reducing operational costs: • Structure • Materials sourced from local resources • Insulation to sheeted roof areas • Office orientation and window layouts to reduce heat build-up • Recycling & Refuse areas provided • Wet Services • Aerated taps to basins and sinks • Low volume flush toilets and urinals • Low flow shower rose • Landscaping – Indigenous plants, micro sprays and drip irrigation • Electrical • Instantaneous water heating to toilet and kitchen facilities • Heat pump geysers to high demand areas (manufacturing) • Translucent sheeting for increased natural light (warehouse) • Lighting control (sensors to kitchen and toilet areas) • 4 x 80W Mega bay flourescent luminaries (T5 lamp technology to warehouse) • 3 x 28W Admiral flourescent luminaries (T5 lamp technology to office areas) • Incandescent light fittings limited to boardroom • Mechanical (Heating, Air-conditioning and Ventilation) • Air-conditioning units equipped with no-volt relays • Use of R 410A refrigerant or better (no ozone depleting substances) ENERGY EFFICIENCY INITIATIVES

  15. Back to contents page CONTACTS PAGE

More Related