LOCATION QUETTA 35 MW GUDDU 1655MW+747MW SUKKUR 50 MW
THERMAL POWER STATION, GUDDU UNITS 1 TO 4
THERMAL POWER STATION, GUDDU UNITS 1 TO 13
REFURBISHMENT PLANBLOCKS 3 & 4 Time Required : 10 &14 Months
REFURBISHMENT PLANBLOCK 2 Time Required : 14 Months
REFURBISHMENT PLANBLOCK 1 Time Required : 15 Months
REFURBISHMENT INCREASE IN MW
CURRENT ISSUES SCRAP • INSUFFICIENT GAS SUPPLY • 260 AGAINST 360 MMCFD • SHORTAGE OF STAFF • TECH. , TEACHING & MINISTERIAL • SHORTAGE OF DOCTORS • JUNCKS
CURRENT ISSUES PLANT 5. MISERABLE CONDITION 6. ESTT. COST FOR REHABTN. OF CHEMICAL PLANT GUDDU Rs.30M JAMSHORO Rs.80M
CURRENT ISSUES COST OF R.O PLANT Rs. 80 Million 4 x 50 m3/hr 7. EVERSE OSMOSIS (R.O) PLANT WATER TREATMENT ANNUAL COST
ISSUES RESOLVED • SUFFICIENT NUMBER OF VEHICLES PROVIDED • RECRUITMENT OF 22 JUNIOR ENGINEERS IN PROCESS • GUDDU COLLEGE UPGRADED TO DEGREE LEVEL
COMPLIANCE TO DECISION OF TRANSITION TEAM 1. THERMOGRAPHIC2. ULTRASONIC DETECTOR3. HELIUM DETECTOR CAMERA
KEY PERFORMANCE INDICATORS (DRAFT) ST - 1 & 2 REPLACEMENTS • Boiler Burners and Burners Management System • Super Heaters No. 4 • High Pressure Steam Pipelines REHABILITATION • F.D Fan / I.D Fan 7 Flue Gas Recirculation Fan • HP & LP Bypass Station • Unit Auxiliaries Equipments • Generator & Allied Equipment • Instrumentation and Control System
KEY PERFORMANCE INDICATORS (DRAFT) ST - 3 REPLACEMENTS • 2nd and 3rd Stag Convective Super Heaters No.6 and 7 of Boiler • Soot Blowing System • Fuel Oil Forwarding Pump at Oil Station • Oil Burners with Remote Control • 25 MVA Units Auxiliary Transformer to be installed REHABILITATION • H.P Heaters renovation • Heat Exchangers • Heating Elements of Air Pre Heaters (Cold and Hot ends) • Air Pre-heaters Flue Gas Ducts • Exhaust Stack (Chimney) • Close Cycle – Circulating Water System • Water Treatment Plant
KEY PERFORMANCE INDICATORS (DRAFT) ST - 4 REPLACEMENTS • Furnace Supervisory Safety System (FSSS) of Boiler by new Modern System REHABILITATION • Soot Blowing System • Heat Exchangers • Air Pre-heaters Heating Elements (Cold and Hot end) • Close Cycle Circulating Water System • Regenerative Air Pre-heaters • Turbine Governing System