1 / 5

Beam Facilities Safety Panel

Beam Facilities Safety Panel. LEMIC – 2008-06-10 – P. Bonnal AB-SU. Mandate approved by the Director-General. Membership. Chairman. Meetings. In the continuation of NIMM (lifetime = 2.5 years). 14 meetings since January 2008. Items to the agendas:

tejana
Download Presentation

Beam Facilities Safety Panel

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beam Facilities Safety Panel LEMIC – 2008-06-10 – P. Bonnal AB-SU

  2. Mandate approved by the Director-General

  3. Membership Chairman

  4. Meetings • In the continuation of NIMM (lifetime = 2.5 years). • 14 meetings since January 2008. • Items to the agendas: • CERN commitments towards Authorities (document to release) • Material and waste handling ; RP buffer zones • Tests of the LHC, TI8, TI2 safety devices • Personal and operational dosimetry (in magnetic field) • Responsibilities in matter of radiation protection/safety • LHC safety risk assessment • Safety audits • ...

More Related