Udo Blell GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract

Task number SIS18- 4. Injection upgrade. Udo Blell GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project October 11, 2007. Udo Blell – FAIR Synchrotrons. The heavy ion synchrotron SIS 18. Injection septum. SIS 18.

tekli
Download Presentation

Udo Blell GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Task number SIS18- 4 Injection upgrade Udo Blell GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project October 11, 2007 Udo Blell – FAIR Synchrotrons

  2. The heavy ion synchrotron SIS 18 Injection septum SIS 18 Inflector magnet UNILAC Experiments Extraction beam line Udo Blell – FAIR Synchrotrons

  3. Upgrade Motivation • Injection septum • Maximum injection energy of U28+ is presently 7.1 MeV/u • Standard energy is 11.4 MeV/u •  Increasing of the electrical field strength and •  increasing of the horizontal aperture • Currently the electrostatic septum is not protected against beam losses.  A scraper to protect the anode is necessary. • To minimize the losses while injection from transfer channel to SIS.  additional beam diagnostic is necessary Udo Blell – FAIR Synchrotrons

  4. Upgrade Motivation • Inflector magnet • The acceptance limitation is given by the present inflector magnet. • > The aperture must be increase • For the bake procedure currently we have to remove the coils from the beam pipe, to install the heating seal. • > The heating seal is permanently build in Udo Blell – FAIR Synchrotrons

  5. Main components of an e - septum Deflection unit Anode Cathode High voltage power supply Vacuumchamber Udo Blell – FAIR Synchrotrons

  6. Parameters of the e-septum Comparison of existing and new e-septum Udo Blell – FAIR Synchrotrons

  7. New septum design • Design goals: • Adjustable anode and cathode • 300 kV insulation • Back able up to 250 ° • Beam diagnostic (profile monitor) • Septum protection (scraper) Udo Blell – FAIR Synchrotrons

  8. New septum design Profile monitor Protection resistor Udo Blell – FAIR Synchrotrons

  9. Cooperation partner • Requirements : • Field strength 100 KV / cm • with the boundary condition >>> 250°C back able • > Cathode surface treatment necessary for an electron emission reduction • Cooperation with Institute of high current electronics in Tomsk (RU) • Pulsed electron beams melt the cathode surface • > The smoother surface reduce electron emission Udo Blell – FAIR Synchrotrons

  10. Costs electrostatic septum • Construction time GSI • Preliminary investigations and project analyses 110 h • 3D – construction 1900 h • Drawings 2D 100 h • Summary 2110 h • Manufacturing costs GSI and other companies • Material and manufacture 246.000€ • Assembly 261h / 60€ 15.660€ • Unexpected and additional work 50.200€ • Summary 311.860€ • Cathode Treatment • Fraunhofer Institut Elektronenstrahl- und Plasmatechnik 20.900€ • Institute of high current electronics in Tomsk (RU) 50.000€ • 300 KV power supply • Supplied by FUG and examined by GSI 160.000€ Udo Blell – FAIR Synchrotrons

  11. Time schedule – injection septum Udo Blell – FAIR Synchrotrons

  12. Inflector magnet New design Magnet • Design goals • Optimized beam path • Build in heating seal Injection channel Connector box SIS beam pipe Udo Blell – FAIR Synchrotrons

  13. New inflector magnet design Udo Blell – FAIR Synchrotrons

  14. Costs inflector magnet • Construction time GSI • Preliminary investigations and project analyses 450 h • Summary 450 h • Manufacturing costs GSI and other companies • Material and manufacture 46.412€ • Summary 46.412€ • High current power supply • Supplied by Jäger 160.000€ Udo Blell – FAIR Synchrotrons

  15. Time schedule – inflector magnet Udo Blell – FAIR Synchrotrons