An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ADO-PO section meetingSafety Sub Section Objectives for the coming months O. beltramello

  2. General Safety • LS1 safety supervision: Dimitar, Didier, Hugo, Sergey, Maryia, Natascia, Edward Daily safety supervision, PPSPS and WPA SLIMOS OPM, EOD • Upgrade of the safety systems: Sergey, Didier • Detector Safety System • New Flammable Gas detection system • Upgrade of the centrale detection gas USA15 • Maintenance of the safety systems: • Sniffers (Didier, Francesco, Gevorg, Fred, Cedric, Charles) • Radiation Gate monitors • Foam system • .Fire detection, gas, etc.. R. Vuillermet

  3. Radiation Protection • New RSO – Giancarlo • New RPE – Alexandre • ALARA budgets for the end of LS1 and future: Irina, Natascia, Illona All FLUKA dose calculations done by G. Mornacchi and C. Ursheler have been transferred. The comparison with the dose measured at start of LS1 are on going. We see a factor 2 maximum of difference between calculated and measured. We will internalise the FLUKA doses calculations starting 1st July (FLUKA model update and new scenarios). A technical student will be hired very soon (July). R. Vuillermet

  4. Radiation Protection • Remote Handling – Christos, Alexandre, Dimitar We are currently setting up an organization in ADO-PO to prepare ourselves to future use of remote handling. We are defining the requirements and tasks impacted. We are currently doing a survey of the market to determine which company is the most suitable for a collaboration (in close collaboration with CERN and especially EN department) The goal is to start a prototype in building 180 within a year with the case of IDEP dismounting. R. Vuillermet

  5. ATWPSS and EDUSAFE • ATWPSS – Christos, Alex, Mark, Dimitar, Vit Upgrade development of the ATWPSS : Miniaturization + “helmet case” Integration of TETRA Adaptation of the system to the Fire Brigade needs Development towards to EDUSAFE technologies • EDUSAFE – Christos, Lakshmi EDUSAFE Network Coordinator Research program on Augmented Reality Technologies R. Vuillermet

  6. Visits • Public visits (Tiina) • Organization of the visits • Training of the guides • Open days (All team) • 27-28-29-30 of September R. Vuillermet