110 likes | 231 Views
RSIC-1 INSTALLATION DEMO. Materials Needed. 25 Ga. Drywall Furring Channel (Hat Track). RSIC-1. Fasteners Needed. Minimum of 2-12”long for Wood applications. Minimum of 1-5/8” long for Steel applications. Minimum of 1-3/4” long for Concrete applications. Tools Needed: Screw gun.
E N D
Materials Needed 25 Ga. Drywall Furring Channel (Hat Track) RSIC-1
Fasteners Needed Minimum of 2-12”long for Wood applications. Minimum of 1-5/8” long for Steel applications. Minimum of 1-3/4” long for Concrete applications
Pac International Inc. Po Box 5369 Aloha, OR 97006 Tel: 503-649-7700 Fax: 503-649-2710 Web Site: www.pac-intl.com