110 likes | 281 Views
WACCM Meeting: 10/13/2005. Agenda items: Status of REF1 and REF2 simulations Status of 2-deg model tuning Running on ES and Columbia Possibilities for running at BCS WACCM documentation and WACCM website Discussion of available resources vs. research needs.
E N D
WACCM Meeting: 10/13/2005 Agenda items: Status of REF1 and REF2 simulations Status of 2-deg model tuning Running on ES and Columbia Possibilities for running at BCS WACCM documentation and WACCM website Discussion of available resources vs. research needs
SSU + MSU 1979-1998 SAGE-I 1979-1981 and SAGE-II 1984-2000 Ozone and temperature trends (REF1) Comparison of simulated and observed zonal-mean T trends, 1979-1998 in the stratosphere Comparison of simulated and observed zonal-mean ozone trends, 1979-2000 in the stratosphere
O3 depletion and recovery in Antarctica, 1975-2045 (REF2) Chlorine loading, peaks in late 1990’s CLOy 86°S 1 mb Antarctic ozone column. Maximum depletion occurs in late 1990’s; recovery begins after ~2010-2015; 1980’s levels reached in 2040’s (series smoothed with a 12-month running mean) O3 column 86°S
2. Status of 2-degree model tuning • Fabrizio, Byron have been tuning the model on Bluesky, Bluevista, Earth Simulator • Model still has at least two important biases/problems • SH cold pole bias; exacerbated by ozone hole interactive chemistry; breakup of SH vortex occurs too late; ozone depletion persists into January • NH winter: smaller number of sudden warmings than observed; breakdown of NH vortex is also too late
3. Running on ES and Columbia Estimated machine comparison for 96 CPUs
Performance of a 5 day simulation on an Altix node on Columbia. All times are in seconds.
4. Possibilities for running at BCS • Visited Barcelona Supercomputing Center (BCS) in september • Presented proposal to do retrospective and prognostic simulations with 2° model (essentially REF1 and REF2) • Proposal was well received; we have been offered the equivalent of 500 model years of computing resources at BCS • Stacy will need to ascertain that the model can be run efficiently at BCS (IBM pc970 (G5) system, 2 CPUs/node, 4 GB/node, Myrinet)
5. WACCM documentation and website • Byron has written a draft WACCM3 document, which has been circulated to WACCM group • Need to fill in sections on chemistry, MLT physics • WACCM website needs to be updated with WACCM3 documentation and instructions for download • Model will be made available as is: no support for implementation • Timetable for completion?
6. Computing resources vs. research needs • Resources • ES: ~ 300 model-years available at 2° • Columbia: ~ 300 model-years at 2° • BCS: ~ 500 model-years at 2° • CSL account: 9000 GAU (~15 model-years at 2°) /month • ESSL account: 3000-4000 GAU (~ 5-7 model-years at 2°)/month • available through end of 2006 • Note: need to write new CSL and ESSL proposals by end of 2005 • Research • Complete 2 additional realizations of REF2 at 4° • Solar cycle simulations (2 x 100 years + control; all at 2°) • Retrospective/prognostic (REF1/REF2) simulations at 2° • Other?
1900 1910 1920 1930 1930 1940 1950 1960 1970 2030 1.9 x 2.5 degree runs, 1995 gases, climatological SST Bluevista Columbia ES Columbia QBO Solar Cycle + QBO Solar Cycle Smin, QBO W Smin, QBO E Smax, QBO W Smax, QBO E smax Control, 1995 smin