SVD2 Trigger

SVD2 Trigger. L1.5 status and plan T. Ziegler Discussion L1/L0 status and plan M. Hazumi TA calibration scheme H. Ishino Discussion. SVD L0 and L1 overview. L0 Latency : less than ~600nsec (in time for VA1TA peaking time)

Download Presentation

SVD2 Trigger

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SVD2 Trigger • L1.5 status and plan T. Ziegler • Discussion • L1/L0 status and plan M. Hazumi • TA calibration scheme H. Ishino • Discussion SVD TA trigger (L0/L1) specification M. Hazumi (KEK)

  2. SVD L0 and L1 overview • L0 • Latency : less than ~600nsec (in time for VA1TA peaking time) • Rate : less than 10kHz for increased current (10~20kHz on average now) • Logic : made of ToF, sCDC, VA1TA • Try to keep the logic as simple as possible • L0 should always be fired when L1 hadron trigger is fired • Monitor : Online (DQM) and offline • L1 (CDC-SVD Matching) • Rate : Compensate for the loss of the CDC Z • rate reduction by 30%; 400Hz  300Hz • Logic : Regional matching, output consistent with present L1 logic • Monitor : Online (DQM) and Offline L1.5 will have the larger reduction. Details available at http://belle.kek.jp/~svd2/trigger/TA/doc/ SVD TA trigger (L0/L1) specification M. Hazumi (KEK)

  3. K. Uchida SVD TA trigger (L0/L1) specification M. Hazumi (KEK)

  4. SVD-TA triggerSystem • Terminology • Local L0 System • Tof L0 : TOF Trigger Master • sCDC L0 : • SVD L0 : ADCTF • Global L0 System • Global Decision Logic (GDL or L1) CDC rphi trigger GDL (Global L1) SVD-CDC matching (SVD L1) ADCTF SVD_L0 Global L0 TTM TOF Trigger Board sCDC trigger Monitor TDCs SVD TA trigger (L0/L1) specification M. Hazumi (KEK)

  5. Schedule SVD TA trigger (L0/L1) specification M. Hazumi (KEK)

  6. SVD L0/L1 preparation status • TA tuning study with beta source for z side done • reported at the last SVD meeting • Calibration scheme under testing  Ishino-san’s talk • Detailed L0/L1 specification prepared with Iwasaki-san • Most of hardware modules in hand • remaining: OR modules b/w CDC-SVD • monitor boards • Firmware in preparation SVD TA trigger (L0/L1) specification M. Hazumi (KEK)

  7. Tp=75ns <trimDAC> = 2/16 globalTh = 2400e- Result after globalTh tuning Definitions TA hit efficiency = #(w/ TA hits) #(all clusters) for Cluster Energy (CE) >60 ADC counts (~0.5 MIP) TA noise hit fraction= #(w/ TA hist) #(all clusters) for 10 < CE < 40 TA hit efficiency = (87  1)% TA noise hit fraction = ( 3  1)% Threshold curve #(w/ TA hits) #(all clusters) for each bin SVD TA trigger (L0/L1) specification M. Hazumi (KEK)

  8. noise b source all clusters Tp=75ns <trimDAC> = 1 globalTh = 4400e- Result before TA tuning Definitions TA hit efficiency = #(w/ TA hits) #(all clusters) for Cluster Energy (CE) >60 ADC counts (~0.5 MIP) TA noise hit fraction= #(w/ TA hist) #(all clusters) for 10 < CE < 40 TA hit efficiency = (47  1)% TA noise hit fraction = ( 3  1)% w/ TA hits Threshold curve #(w/ TA hits) #(all clusters) for each bin SVD TA trigger (L0/L1) specification M. Hazumi (KEK)

  9. Tp=300ns <trimDAC> = 8/16 globalTh = 4400e- Life is much easier with Tp=300ns ! Definitions TA hit efficiency = #(w/ TA hits) #(all clusters) for Cluster Energy (CE) >60 ADC counts (~0.5 MIP) TA noise hit fraction= #(w/ TA hist) #(all clusters) for 10 < CE < 40 TA hit efficiency = (99  1)% TA noise hit fraction = ( 3  1)% Threshold curve #(w/ TA hits) #(all clusters) for each bin SVD TA trigger (L0/L1) specification M. Hazumi (KEK)

  10. Discussion • Tp=300ns much better than Tp=75ns • Encouraging ! L1 trigger will be OK if we take this option ! • Consistent with IDEAS test results (http://belle.kek.jp/~svd2/va1ta/va1ta_test05.pdf) • L0 latency (max.) = 835ns; Is this acceptable ? • Eff.=87% for Tp=75ns; adequate ? • need simulation study • simple estimation  91.5% for 3-out-of-4 logic • Several possible options • Tp=300ns for Z trigger for L1, Tp=75ns for rphi for L0 • Tp=300ns with L0 latency=835ns • ... • The decision depends on the actual condition. Be flexible for now. • Test_on=0 “seems” more stable SVD TA trigger (L0/L1) specification M. Hazumi (KEK)

  11. L0 Latency detail 450 ns 410ns 405ns 305ns 300ns 240ns ns 355ns 610ns Global L0 (+50) • latest timings are shown • additional delay with pipeline may be introduced ~1m ADCTF (+50) ~1m TOF Trigger Master TTM (+40) (30+2) m *850ns for present L0 sCDC trigger Detector sCDC TOF (30+2) m SVD 90 ns SVD TA trigger (L0/L1) specification M. Hazumi (KEK)

  12. L0 Latency-2 (Tp=300ns) 675 ns 635ns 630ns 530ns 525ns 240ns ns 355ns 835ns Global L0 (+50) • latest timings are shown • additional delay with pipeline may be introduced ~1m ADCTF (+50) ~1m TOF Trigger Master TTM (+40) (30+2) m *850ns for present L0 sCDC trigger Detector sCDC TOF (30+2) m SVD 315 ns SVD TA trigger (L0/L1) specification M. Hazumi (KEK)

  13. C1-3 clk (B4-1) System Block Diagram CDC-L1-rphi-short (64bits) diff. ECL NIM L1 SVDCDC-S C5-2 1+3.5+0.5m LVDS A1-3 NIM LVDS SVD-L0 (36bits) NIM LVDS 10+1m NIM LVDS L1 SVDCDC-L C5-2 C5-1 8 5+1m TOF_L0(1bit) LVDSECL CDC-L1-rphi-long (64bits) B5-1&2 8 to GDL 5+1m L0T (global L0) A1-4 16 1 L0 (to TTM) OR (3216) 64 B3-4 16 8+1m TOF hits(32bits) 16 LVDSECL to monitor TDCs C5-1 (same module) CDC OR (6416) B2-4 CDC OR (6416) sCDC hits(256bits) CDC OR (6416) CDC OR (6416) C3-1 5+1m SVD TA trigger (L0/L1) specification M. Hazumi (KEK)

  14. Module List ordered (delivered) SVD TA trigger (L0/L1) specification M. Hazumi (KEK)

  15. EH floor plan 1 2 3 4 5 6 7 entrance A B C D SVD TA trigger (L0/L1) specification M. Hazumi (KEK)

  16. Schedule SVD TA trigger (L0/L1) specification M. Hazumi (KEK)

  17. Task Sharing • Overall spec. & schedule : Hazumi • Interface to CDC/TOF/GDL : Hazumi • TA study w/ 1/10 : Nakadaira, Hazumi • TA calibration scheme : Ishino, Kaneko • ADCTF trigger firmware : Vienna group • final logic • special firmware for cosmic • L0 firmware : Mikami, Ushiroda • L1 firmware : Hazumi, Kurashiro • TA monitor : Ushiroda, Matsumoto • L0/L1 online software : • L0/L1 offline software : Other potential manpower: Y. Onuki, T. Shibata, M. Watanabe (Niigata), M1 (Tokyo), J. Chen (NTU), K. Hara (Osaka), Y. Nakano, M1 (Tsukuba) SVD TA trigger (L0/L1) specification M. Hazumi (KEK)