SVD2 System test status

SVD2 System test status. Problem 1 Around 4/15, we met current shortage problem. On VA parameter tuning To obtain shorter shaping time(Tp), we changed “mbias”. Mbias defined DAC range inside VA1TA Mbias = 0.9mA/hybrid, Tp= 1.2us ⇒2.0mA(Typ. on VA manual) , Tp= 700ns

meryle
Download Presentation

SVD2 System test status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SVD2 System test status • Problem 1 • Around 4/15, we met current shortage problem. • On VA parameter tuning • To obtain shorter shaping time(Tp), we changed “mbias”. • Mbias defined DAC range inside VA1TA • Mbias = 0.9mA/hybrid, Tp=1.2us ⇒2.0mA(Typ. on VA manual) , Tp=700ns • Finally, we found a current shortage occurred on MAMBO and PS. • Modified MAMBO and PS Cabling⇒Solved on 53 and 5/13

  2. Power supply system Power Supply×10 DOCK +/-7.5~9.5V +5V Analog+ (5A) VA1TA 3A REBOx3 +3V +1.5V 3A 1A -5V Analog- (10A) 2A -3V -2.0V 6A 2A +5V Digital+ (5A) 3A Solved! -5V Digital- (5A) 3A MAMBO

  3. Power supply +V 1.6times lager than expected value Power Supply DOCK +5V Analog+ (5A) VA1TA 3A REBOx3 +3V +1.5V 3A 1A -5V Analog- (10A) 2A -3V -2.0V 6A 2A Modification has been succeeded!! +5V Digital+ (5A) 3A -5V Digital- (5A) 3A MAMBO

  4. System test status(cont’d) • Problem 2 • With higher “mbias”(=2mA/hybrid), some VA output showed oscillation. (5/17) • With lower mbias(0.9mA/hybrid), no oscillation. • Phenomena • Only on L4,L3-BW (3DSSDs half ladder) • No oscillation on L1,L2,L3-FW • Osc. occur on P and N simultaneously. • Investigation • Grounding Endring MAMBO • Capacitor btw hybrids : check with L3 ladder. • Offset voltage ⇒no effects

  5. With mbias=2mA/hybrid outA difference outB f=1.95MHz

  6. offset N=+40V P=-40V DSSD DOCK Hybrid

  7. Capacitor btw. hybrids disconnected • Mbias=2.0mA

  8. Capacitor btw. hybrids disconnected • Lower mbias

  9. Solution(?) • Setting for Prebias (3 bits) • Bit 1 must be 0!! • “110” must be the largest Prebias value. • Still unstable at single channel mode • Some hybrids oscillate sometimes. • Other parameters should be tuned • Trigger performance is not • Range of parameter tuning is restricted for VA and TA

  10. outA Tp=650ns Long tail outB

  11. Typ mbias(2mA) • Prebias=“100” • Others are “fast” parameter • 1 hybrid on L4 shows huge noise.

  12. Schedule (for next two weeks) • Full system • L1.5 integration (Ziegler) Continue • VA tuning (Matsumoto) 5/22. • TA threshold tuning ( Ishino, Kaneko)5/23~6/1 • Cosmic ray run should be resumed ASAP for trigger integration and final system check. • 5/25- Test run • 6/2- Cosmic run • 8 hour/day • TA tuning, Trigger integration, slow control test in parallel • 1/10 system • TA study, trigger integration(Hazumi, Nakadaira) • Laser scanning for test sensor (Tsuboyama)

  13. -3V analog ~5A 0.5W Output -3.3V 6A needed • 0.5W resistor is too small • Limited ~ 4A • Replaced to 1W ⇒ OK up to 6A • Krakow agreed to the modification • Recommend to use larger power consumption resistor Regulator(1.4A) Input -7.5~-9.5V