An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wrap Up What you should walk away with today • Understanding of how skewed structures behave • When you should be doing a refined analysis • Skewed structures (remember the flow chart) • Large deck overhang (at any skew)

  2. Wrap Up What you should walk away with today • Deck placement responsibilities • Large deck overhangs are BAD • Stiffer beams for high skewed structures are GOOD

  3. Wrap Up What you should do with this information • CMS changes for deck pours will become effective in April, 2007 • Projects sold after May 1, 2007 will include these changes in SS 800

  4. Wrap Up What you should do with this information • If at preliminary stage of bridge design • Implement what you heard today

  5. Wrap Up What you should do with this information • Large Deck Cantilevers – if in detail design • Look at your design and see if changes are necessary • Contact your ODOT PM if you believe changes are necessary. • OSE will work with the Districts on case by case

  6. Wrap Up What you should do with this information Large skews • Current BDM 302.2.7 directs designers to contact OSE when certain criteria are met. • If this was done, continue with the direction that you were given. • If in detail design and had not contacted OSE or District • Review your design • Contact ODOT PM if changes are necessary • OSE will work with Districts on case by case

  7. Wrap Up What you should do with this information Intermediate Crossframes • Do Not use slotted holes at connections • Fully connect intermediate crossframes prior to deck placement.

  8. Wrap Up QUESTIONS ? E-mail questions to: ose@dot.state.oh.us