An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Request for Project InitiationPublic Safety Radio Modernization Assessment NM DOIT PCC Presentation September 2012 Presented by: Laura Phillips

  2. Public Safety Radio Modernization Assessment: Vision • The existing LMR architecture is decades old and in dire needs of a comprehensive upgrade. • In conjunction with the build out of SIRCITS and narrow banding, this is an ideal time to pursue a comprehensive LMR modernization to provide operability and interoperability to meet local, state, federal needs and requirements.

  3. Strategic Planning It is expected that modernization of the LMR network will require a capital appropriation in the future. In advance of any appropriation, the following planning phases need to be conducted: An Assessment Phase: • Gap analysis and capability assessment of current system including coverage, resiliency, meeting public safety business or user requirements • Analysis of repeater architecture in light of newer technologies available • Spectrum use, allocation and assignment

  4. Planning • The final report is expected to provide necessary information and options to be considered before proceeding with future phases, an appropriation request, design/additional planning and implementation.

  5. This request: • Release of $50K to secure professional services to assist with preparation of RFP (content) and work plan for a comprehensive assessment, gap analysis, recommendations/options and strategic plan for modernization of the LMR system. • Q&A