Status of the FAIR Project

Status of the FAIR Project. Boris Sharkov FAIR Scientific Director ( des. ) NuPECC Madrid 31.06.2010. Romania. Russia. Austria. Finland. China. France. Germany. Greece. India. Italy. Poland. Slovakia. Slovenia. Spain . Sweden. U K. Saudi Arabia.

tulia
Download Presentation

Status of the FAIR Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) NuPECC Madrid 31.06.2010 Romania Russia Austria Finland China France Germany Greece India Italy Poland Slovakia Slovenia Spain Sweden U K Saudi Arabia

  2. Research Communities at FAIR SIS 100/300 Nuclear Matter Physics with 35-45 GeV/u HI beams, x1000 CBM HADES HESR Rare Isotope Production Target Hadron Physics with antiprotons of 0 - 15 GeV Super FRS Antiproton Production Target Plasma Physics: x600 higher target energy density 600kJ/g Nuclear Structure & Astrophysics withrare isotope beams, x10 000 and excellent cooling FLAIR CR- RESR • Special Features: • 50ns Bunched beams • Electron cooling of secondary beams • SC magnets fast ramping • Parallel operation NESR High EM Field (HI) _ Fundamental Studies(HI & p) Applications (HI) 100 m B. Sharkov

  3. Development of Project Staging Modularized Start Version B. Sharkov 3

  4. Rationale for new Modularized Start Version (WP) in 2009 • a detailedcostestimatefor CC presentedbyarchitects • a new cost estimate in 2009 for the accelerator complex • Detailedlistofsiterelatedconstruction costs was worked out • firm commitments of FAIR Member States • Germany and State of Hesse announcedto cover "site-dependent" constructioncosts outside FAIR projectbudget+ 110 M€ ! B. Sharkov

  5. Basic Criteria : Outstanding researchopportunitiesshouldbeofferedtoall fourscientificpillarsof FAIR bytheModularized Start Version B. Sharkov 5

  6. Modularized Start Version Module 0: SIS100 and connection to existing GSI accel. Module 4: low energy RIB and low energy antiprotons Module 1: Experimental areas Module 5: RESR storagering P+ beamline ABM building Module 2: Super-FRS Module 3: High-energy antiprotons (p-linac, pbar-target, CR, HESR) B. Sharkov

  7. CBM/HADES APPA PANDA NuSTAR Science with the Modularized Start Version B. Sharkov

  8. Cost Estimate Modules 0-3 (Price Basis 2005) all values in M€ B. Sharkov

  9. Firm Commitments Primeminister Putin signed. Officially publicized last week. not firm for the first batch Kingdom of Saudi-Arabia signed the Declaration to contribute at least 1 % B. Sharkov

  10. Dear Colleagues, We are happy to inform you that the Decree of the Russian Government on Russian participation in FAIR project was issued and published. Its number is 245-p of February 27, 2010. By this decision Russian Government approved the project of FAIR Convention with Russian contribution to FAIR construction in the amount of 178,05 MEuro (prices of January 2005) and authorized the State Corporation “Rosatom” to be Russian Shareholder of FAIR Company. Sincerely,     O.Patarakin, P.Bogdanov. 

  11. Finance Summary Cost of Modularized Start Version = 1027 M€ Firm funding commitments of FAIR Partners = 1039 M€ Modularized Start Version secures a swift start within the current funding commitments B. Sharkov

  12. Evaluation Board 16 October 2009 1. The Modularized Start Version is the right way to proceed. 2. The project is more focussed and is in even better shape. 3. We should now start as soon as possible! The Green Paper outlines the path to achieve this goal B. Sharkov

  13. FAIR accelerator Work Packages B. Sharkov 19

  14. International Partner 1 WP 1 form International Partner 2 WP 2 FAIR GmbH Consortium (represented by Consortium Leader) International Partner 3 WP 3 International Partner n WP n

  15. BINP Novosibirsk Preparatory Phase R&D by GSI & Partner Institutes SIS300 magnets NESR Electron Cooling IHEP Protvino SIS100 rapidly cycling sc magnets CEA / CNRS Variable Frequency Cavities B. Sharkov

  16. SIS18upgrade Program Scrapers and NEG coating for pressure stabilization Injection system for low charged state heavy ions Charge separator for higher intensity and high quality beams h=2 acceleration cavity for faster ramping Power grid connection The SIS18upgrade program: Booster operation with low charge state heavy ions

  17. Acceleration of Intermediate Charge State Heavy Ions • Significant progress with Ta24+ and U27+ ions due to the upgrade program in comparison with 2001 • Maximum beam energy about 200 MeV/u

  18. Roadmap • Start of construction activities 2010/11 +1 year • Schedule is driven by civil construction • Aim for earliest commissioning of accelerators and respective experiments +1 year +1 year +1 year B. Sharkov

  19. Road Map FAIR Site & Buildings 2009 2010 2011 2012 2013 2014 2015 2016 2017 1 2 3 4 6 7 8 9 10 5 1 Handing in of preplanning documents to hbm Clarification of user requirements Modularized Start Version (MSV) Start revised preplanning for MSV Expected approval of revised planning for MSV Preparation of documents for building permit Expected approval for (partial) building permit Start site preparation (clearing trees) Award contracts on civil construction work lot 1 … 4 Completion of civil construction work lot 1 … 4 Start installation of accelerators and detectors 2 3 4 5 6 7 8 9 10

  20. Buildingthe FAIR GmbH Recruitment of key personnel: Research Director In-Kind Coordinator Head of Sites and Buildings Legal and accounting staff Staff for the coordination of accelerators and experiments (Currently only contracts for 2010 possible (via GSI)) B. Sharkov 27

  21. Roadmap to foundation the FAIR company 01 02 03 04 05 06 07 08 09 10 11 12 2010 2011 1 2 3 4 5 6 7 8 1 KW1: Fertigstellung der Rechtsdokumente KW8: Dokumente von Auswärtiges Amt an andere Außenministerien versandt KW13: Alle Übersetzungen zurück beim Auswärtigen Amt KW19: Alle offenen Fragen der Übersetzungen bilateral gelöst KW22: Alle Rechtsdokumente in den fünf Vertragssprachen verfügbar KW32: Formale Zustimmung aller Partnerländer KW33: Übersetzerkonferenz – Translation conference KW37: Formelle Unterzeichnung der Konvention KW38: Gründung der FAIR GmbH 2 3 4 5 6 7 8 B. Sharkov 28

  22. Conclusions • Based on recent cost estimates and firm commitments of FAIR Member States the Modularized Start Version is elaborated • Modules 0-3 ensure a physicsprogrammethatisunique, competitivewithgreatdiscovery potential • All FAIR sciencecommunitiescanperformexcellentphysicsfromearly on • The facilitycanbesmoothlyupgradedtowardsthefullversionof FAIR (modules 4,5,6) • Setup ofthe international FAIR companyproceeds in parallel FAIR is gathering MOMENTUM ! B. Sharkov

  23. Board of FAIR Collaborations founded • APPA, CBM, NuSTAR, PANDA: two representatives each • discuss common issues (e.g. research and funding) • initiate joint activities Contact your funding agencies! Raise more money for your experiment !

  24. B. Sharkov