VELO-installation September 7, 2006 • installation of exit window + part I of the beam pipe • logging of vacuum data • what’s next VELO
August 14: opening of RICH1-side of VELO-tank to install exit window with w.f.s. + beam pipe part I VELO
What’s next ?? • Perform vacuum tests (venting with Ar, mass spectra, etc.) • (≈ end of September) • Get PVSS implementation running • Measuring ((x,y,z) + leaktest) and manipulating of rf-boxes @ NIKHEF • Apply NEG-coating on rf-boxes • Organize clean + adequate working place for rf-box mounting • Uninstall bellows • Perform various repairs (see next slide) • Combine bellows + rf-boxes • Measure geometry • Install bellows + rf-boxes • Perform extensive vacuum tests • Check positioning VELO
baratrons Repair list + 1 motion axis to be replaced VELO