1 / 9

Long Term Operation and Plans for Tests at GIF

Long Term Operation and Plans for Tests at GIF. CMS GEM Upgrade Workshop III Jeremie MERLIN and Christopher Armaingaud ( University of Strasbourg * ). April 20,2012. * Also at Telecom Physique Strasbourg. Long Term Operation and Plans for Tests at GIF.

urbana
Download Presentation

Long Term Operation and Plans for Tests at GIF

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Long TermOperation and Plans for Tests at GIF CMS GEM Upgrade Workshop III Jeremie MERLIN and Christopher Armaingaud (University of Strasbourg*) April 20,2012 * Also at Telecom Physique Strasbourg

  2. Long TermOperation and Plans for Tests at GIF Introduction to the ageingprocess • The ageing process • Polymer formation in the avalanche plasma • Direct deposition of pollutants • Appearance of reactive gas/products in the avalanche process From M. Capeans, Ageing of Gaseous Detectors : assembly materials and procedures, CERN 2/9 Jeremie MERLIN Christopher Armaingaud CMS GEM Upgrade Workshop III April 20,2012

  3. Long TermOperation and Plans for Tests at GIF Introduction to the ageingprocess • The aim of the ageing test • Ensure a long term operation in CMS • Understand the effects of the radiation on the materials • If there is ageing, understand its origin and propose solutions 50μm 3/9 Jeremie MERLIN Christopher Armaingaud CMS GEM Upgrade Workshop III April 20,2012

  4. Long TermOperation and Plans for Tests at GIF The previousageingmeasurements -double GEM- • Standard operation conditions • Ar/CO2 : 70/30 • Setup • 6 keV X-rays, rate: 4,75.104 Hz/mm2 • Drift: 2kV/cm , Others: 4kV/cm • Gain: 2,2.103 Data from S. Bachmann et al.,Development and test of large size GEM detectors, IEEE Trans. Nucl. Sci. NS-47 (2000) 1412 4/9 Jeremie MERLIN Christopher Armaingaud CMS GEM Upgrade Workshop III April 20,2012

  5. Long TermOperation and Plans for Tests at GIF The previousageingmeasurements -triple GEM- • Standard operation conditions • Ar/CO2 : 70/30 • Setup • 8,9 keV X-rays, rate: 103 - 104 Hz/mm2 • Drift: 2,5kV/cm , Others: 3,7kV/cm • Gain: 8,5.103 Data from M. C. Altunbas et al., Aging Measurements with the Gas Electron Multiplier (GEM), CERN-EP/2001-091 5/9 Jeremie MERLIN Christopher Armaingaud CMS GEM Upgrade Workshop III April 20,2012

  6. Long TermOperation and Plans for Tests at GIF The ongoingageing test • Standard operation conditions • Ar/CO2/CF4 : 45/15/40 • Setup • 137Cs source, A: 566 GBq • Drift: 3kV/cm , Others: 3,5kV/cm-5kV/cm • Gain: 8.103 - 104 During 6 months in the GIF 6/9 Jeremie MERLIN Christopher Armaingaud CMS GEM Upgrade Workshop III April 20,2012

  7. Long TermOperation and Plans for Tests at GIF The ongoingageing test -Gamma Irradiation Facility- GEM lead shield From I. Brunner, Integrated dose around the GIF installation from June to September 2004, CERN-SC-2004-077-RP-SN 7/9 Jeremie MERLIN Christopher Armaingaud CMS GEM Upgrade Workshop III April 20,2012

  8. Long TermOperation and Plans for Tests at GIF Meteo Station Power Supply System The ageing test -setup- Gas input HV Pressure Temp° Humidity LEAD SHIELD Mass Chromatography SWPC 5 l/h Gas Output CPU GPIB GND LabView-program SWPC Dual Timer GIF EXPERIMENT OVERVIEW GND Picoammeter VETO C-program GND ADC (965) Discriminator 50x GATE/RATE Preamplifier unipolar Amplifier Readout Connections Multii-Channels Common Gate Input : negative Output Range : 10V Int/Diff : 0.25/0.25 BLR : out GATE Attenuator 8/9 VME Jeremie MERLIN Christopher Armaingaud Linear fan in/fan out April 20,2012

  9. Long TermOperation and Plans for Tests at GIF Thank you 9/9 Jeremie MERLIN Christopher Armaingaud CMS GEM Upgrade Workshop III April 20,2012

More Related