130 likes | 388 Views
In Progress Review JKO Mobile Work for Task Order 180 05 November 2013. Agenda. Executive Summary Approach Build 2 Schedule Build 3 Schedule Line Items by Build Build 2: App Bugs/Enhancements Build 2: m-Learning Suite Bugs/Enhancements Build 3: App Bugs/Enhancements
E N D
In Progress ReviewJKO Mobile Work for Task Order 18005 November 2013
Agenda • Executive Summary • Approach • Build 2 Schedule • Build 3 Schedule • Line Items by Build • Build 2: App Bugs/Enhancements • Build 2: m-Learning Suite Bugs/Enhancements • Build 3: App Bugs/Enhancements • Build 3: m-Learning Suite Bugs/Enhancements • Program Management
Executive Summary • Task Order 180 Period of Performance ends 10 July 2014 • Work requires bug fixes and enhancements: • JKO Mobile App: • 12 bugs • 7 enhancements • M-Learning Suite: • 16 bugs • 3 enhancements • Total: 38 items - 28 bugs, 10 enhancements • We will do this in two build cycles: • Build 2, September 2013 through January 2014 (5 months) • Build 3, February 2014 through June 2014 (5 months)
Approach JKO Systems Engineering Process Transition Moves a system element to the next development stage or to the user. Stakeholder Requirements Definition Translates stakeholder needs into technical requirements. Validation Confirms that system elements meet stakeholder requirements. Verification Requirements Analysis Confirms that system elements meet design-to or build-to specifications. Improves understanding of requirements and their functional relationships. Realized Solution Solution Specified Design Integration Incorporates lower-level system elements into higher-level ones. Architecture Design Implementation Develops alternative design solutions, physical architectures and selects final design. Creates (making, buying, or reusing) low-level system elements.
Knowledge as a force multiplier JKO Mobile Development Timeline – Build 2 (as of 12 Sept 2013) Green= Complete, Yellow= In progress, Red= Off schedule, Black = Not started
Knowledge as a force multiplier JKO Mobile Development Timeline – Build 3 (as of 12 Sept 2013) Green= Complete, Yellow= In progress, Red= Off schedule, Black = Not started
Program Management • Weekly updates at JSSM • Monthly updates at Production Brief • IPRs held monthly to measure progress