General Key Point Indicators China EMU Project Week 8. Frédéric SANCHEZ Deputy Project Manager EMU China. February 20th, 08. EMU CRH5 – General overview for week 8 on Operation parts.

velvet
Download Presentation

General Key Point Indicators China EMU Project Week 8

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. General Key Point Indicators China EMU ProjectWeek 8 Frédéric SANCHEZDeputy Project Manager EMU China February 20th, 08

  2. EMU CRH5 – General overview for week 8on Operation parts. • 1 delay in Commercial Service due to air leakage on brake pipe on CKD01. Lack in manufacturing process on CRC production line identified. • Nbre of failure significantly increased due to: • Nbre of km ramp up : 320.000km a week • CRC finaly participate to the Work Order process opening one record for any signal job there are in charge. Reminder: Alstom is responsible for EUR01 and CKD01 train, plus traction kit on Domestic train.CRC is reponsible for all the 20 domestic trains in commercial service • Top Failure : • Doors : Lot of information now from CRC. Analysis in process. • Interior: Analysis showing that failures are not mainly due to vandalism. PDCA will be opened. • Waste and water system. • Catering: Problem under investigation. • Traction and Auxiliairy : Still the know issues. Retrofit in progress in the depot. • Availability of traction: Because 45 mn allowed to CW team to fix the problem not enought, some trains are running with some traction isolated. • Testing : EUR02 failed the multiple unit dynamic test because major problem on the SW. KPI Project EMU China - 20/02/2008 - P 2

  3. EMU CRH5 – Failure Affecting Service 1 Delays on week 8 23/2/2008 CHR5 001+004Pneumatic connector lossen on Brake Pipe. The train stops on the line. KPI Project EMU China - 20/02/2008 - P 3

  4. EMU CRH5 – Fleet failure record • Alstom failures has been recorded by Alstom CW Team and are consolidated by RAMS Team • CRC failures are recorded with incomplete information and some of them are not consolidated by Alstom • The total of the failures is the view of MOR KPI Project EMU China - 20/02/2008 - P 4

  5. EMU CRH5 – Fleet failure record Alstom/CRC KPI Project EMU China - 20/02/2008 - P 5

  6. EMU CRH5 – Fleet failure record • Some of the failures of this week are not closed yet. The figure of this present week could be slightly superior next week. KPI Project EMU China - 20/02/2008 - P 6

  7. EMU CRH5 – Fleet failure record Alstom/CRC • Some of the failures of this week are not closed yet. The figure of this present week could be slightly superior next week. KPI Project EMU China - 20/02/2008 - P 7

  8. EMU CRH5 – Fleet failure record KPI Project EMU China - 20/02/2008 - P 8

  9. EMU CRH5 – Fleet failure record KPI Project EMU China - 20/02/2008 - P 9

  10. EMU CRH5 – Fleet failure record KPI Project EMU China - 20/02/2008 - P 10

  11. EMU CRH5 – Fleet failure record KPI Project EMU China - 20/02/2008 - P 11

  12. EMU CRH5 – Fleet failure record KPI Project EMU China - 20/02/2008 - P 12

  13. EMU CRH5 – Fleet failure record per week TOP failure of the week: • Door System • Interiors • Water and wate systems • Traction SubSystems • Auxiliary SubSystems KPI Project EMU China - 20/02/2008 - P 13

  14. EMU CRH5 – Fleet failure record of last 4 weeks by subsystem • Alstom failures has been recorded by Alstom CW Team and are consolidated by RAMS Team • CRC failures are recorded with incomplete information and not consolidated by Alstom • The total of the failures is the view of MOR KPI Project EMU China - 20/02/2008 - P 14

  15. EMU CRH5 – Failures due to vandalism & Failures affecting passengers’ comfort Failures affecting comfort are related to Doors, Water&Waste System, Interior, PIS, Catering and HVAC. KPI Project EMU China - 20/02/2008 - P 15

  16. EMU CRH5 – Trains Commissioned for Service KPI Project EMU China - 20/02/2008 - P 16

  17. EMU CRH5 – Reliability IndicatorsTop 5 Fleet failure records breakdown of last week KPI Project EMU China - 20/02/2008 - P 17

  18. EMU CRH5 – Reliability IndicatorsTop 5 Fleet failure records breakdown of last week KPI Project EMU China - 20/02/2008 - P 18

  19. EMU CRH5 – Reliability IndicatorsTop 5 Fleet failure records breakdown of last week KPI Project EMU China - 20/02/2008 - P 19

  20. EMU CRH5 – Fleet MileageTotal Kilometres per Week KPI Project EMU China - 20/02/2008 - P 20

  21. EMU CRH5 – Fleet MileageTotal Kilometres per Week KPI Project EMU China - 20/02/2008 - P 21

  22. EMU CRH5 – Delivery Status KPI Project EMU China - 20/02/2008 - P 22

  23. EMU CRH5 – Reliability IndicatorsMean Time Between Failure with Alstom and CRC Failures MTBF is updated on a monthly basis . KPI Project EMU China - 20/02/2008 - P 23

  24. EMU CRH5– Reliability IndicatorsTraction - Auxiliary Availability, Power Module failure • Traction and Auxiliairy recovered by a reset during the service is counted as not available. • Traction and Auxiliairy isolation due mainly to cooling fans and motor fans contactors. • Stability of the Power Module Failure. The CMOS component individuated has a high infant failure and then get stable. KPI Project EMU China - 20/02/2008 - P 24

  25. EMU CRH5 –Reliability Growth Indicators from PDCA file shared with On-Share and Off-Shore Team KPI Project EMU China - 20/02/2008 - P 25

  26. EMU CRH5 –Reliability Growth SESTO Action Plan on List of Issues KPI Project EMU China - 20/02/2008 - P 26

  27. EMU CRH5 –Reliability Growth SESTO Action Plan on List of Issues KPI Project EMU China - 20/02/2008 - P 27

  28. EMU CRH5 –Reliability Growth SESTO Action Plan on List of Issues KPI Project EMU China - 20/02/2008 - P 28

  29. EMU CRH5 –Reliability Growth SESTO Action Plan on List of Issues - Indicator KPI Project EMU China - 20/02/2008 - P 29

  30. EMU CRH5 –Reliability Growth SESTO Action Plan on List of Issues – Forecast Indicator KPI Project EMU China - 20/02/2008 - P 30

  31. EMU CRH5 – TT progress IndicatorsGeneral Progress & Documentation * TCMS ; Open points/TT Contract Matrix KPI Project EMU China - 20/02/2008 - P 31

  32. EMU CRH5 – TT progress IndicatorsTraining & Assistance KPI Project EMU China - 20/02/2008 - P 32

  33. EMU CRH5 – TT progress IndicatorsAcceptance & Official Letters 25% Requested - 25% Signed by CH Partners - 25% Signed by CRC - 25% signed by MOR KPI Project EMU China - 20/02/2008 - P 33

  34. EMU CRH5 – TT progress IndicatorsOfficial Letters KPI Project EMU China - 20/02/2008 - P 34

  35. EMU CRH5 – NCR Status for CKD Trains KPI Project EMU China - 20/02/2008 - P 35

  36. EMU CRH5 – NCR Status for Domestic Trains KPI Project EMU China - 20/02/2008 - P 36

  37. EMU CRH5 – Configuration To Reach CL9 Mech KPI Project EMU China - 20/02/2008 - P 37

  38. EMU CRH5 – MV loads failures events KPI Project EMU China - 20/02/2008 - P 38