1 / 32

Re-DEC Working Group Meeting Potential Challenges to High Penetration of Distributed Renewable Generation

Re-DEC Working Group Meeting Potential Challenges to High Penetration of Distributed Renewable Generation. December 9, 2009. Purpose of Presentation . Present initial thoughts on barriers or issues with interconnection of distributed renewable generation Identify if challenges are:

vicki
Download Presentation

Re-DEC Working Group Meeting Potential Challenges to High Penetration of Distributed Renewable Generation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Re-DEC Working Group MeetingPotential Challenges to High Penetration of Distributed Renewable Generation December 9, 2009

  2. Purpose of Presentation • Present initial thoughts on barriers or issues with interconnection of distributed renewable generation • Identify if challenges are: • Prevalent today (near-term) • Can be solved with relatively minimal effort • Discuss potential solutions Black & Veatch - 2

  3. Today’s Focus • Want to encourage open dialogue, but want to focus on scope of today’s meeting • Not re-debating Feed-In-Tariff or Renewables Auction Mechanism • Dialogue to focus on solutions and not problems • Please review entire matrix before bringing up new challenges Black & Veatch - 3

  4. For this Workshop, What Do We Mean By Distributed Renewable Energy? • Generally we are focusing on: • Wholesale distributed generation • 1-5 MW in size • Connected to distribution system • Probably located at customer sites, but not behind the meter • Solar photovoltaics • Non-Solar DG have some similar challenges Black & Veatch - 4

  5. Literature Reviewed • Literature reviewed from the following institutions: • Institute of Electrical and Electronic Engineers • Department of Energy • California Public Utilities Commission proceedings and comments • Federal Energy Regulatory Commission • California Energy Commission • National Renewable Energy Laboratory • Sandia National Laboratories • Academic Papers • Other sources • Systems • Spain • Italy • Canada • Germany • United Kingdom • United States But, every system is unique! Black & Veatch - 5

  6. Draft Challenges Matrix • Developed based on literature review, discussion with utilities and developers, comments from CPUC 33% RPS Implementation Preliminary Results report, etc. • Identifies potential challenges ranging from technical to market • Meant to be inclusive – have not tried to “trim” the list much • Want to get feedback from stakeholders if they view these as issues for them • Eventually we will prepare roadmap of potential solutions, timing, cost, etc. Black & Veatch - 6

  7. Challenges: We Want to Explore Near and Long-Term Issues • Near-term (<1 year) • What issues are utilities and developers facing today? • What are the potential issues associated with the FIT programs? • Long-term (>1 year) • What would happen if we installed 15,000 MW of Renewable DG? (Current peak ~50,000 MW) • What if solar cost 1 cent/kWh? Black & Veatch - 7

  8. Solutions: There are many Possibilities, from Low to High Effort • Dedicated Feeders • Forecasting Solar • Cluster Systems – Develop “Solar Grid Overlay” • Energy Storage • Smart Grid, for example: • Dynamic monitoring and control • Re-Sectionalizing • Load Control • Institute a First Pass / Fatal Flaw Interconnection Application • Curtailing Generation • Increase Substation and Feeder Information Available to Developers • Update Inverter Standards • Load Tap Changers, more Capacitor Banks • Low Voltage Ride Through Black & Veatch - 8

  9. Solution Effort Challenge Timeframe Black & Veatch - 9

  10. Low Solution Effort High Long Near Challenge Timeframe Black & Veatch - 10

  11. Challenge Timeframe: Near Term Solution Effort: Low Challenge Timeframe: Long Term Solution Effort: Low Challenge Timeframe: Near Term Solution Effort: High Challenge Timeframe: Long Term Solution Effort: High Low Solution Effort High Long Near Challenge Timeframe Black & Veatch - 11

  12. Challenge Timeframe: Near Term Solution Effort: Low Challenge Timeframe: Long Term Solution Effort: Low Challenge Timeframe: Near Term Solution Effort: High Challenge Timeframe: Long Term Solution Effort: High Matrix Definitions • Challenge Timeframe • Near term – issue is apparent, or will be, within 1 year • Long term – issue will be apparent in more than 1 year • Solution Effort • Low – cost, difficulty, and implementation timeframe for possible solution is low • High – cost, difficulty, and implementation timeframe for possible solution is high Black & Veatch - 12

  13. CHALLENGE: Near SOLUTION EFFORT: Low • Siting: Identifying low cost interconnection sites • Regulatory: Cost recovery & allocation mechanisms • Process: Lack of clarity between FERC and PUC jurisdiction • Process: Time consuming and costly interconnection procedures • Process: High volume of interconnection applications • Process: New developers unfamiliar with procedures • Protection: Coordination of PV systems with existing distribution system • Voltage Regulation: PV systems affect grid voltage Black & Veatch - 13

  14. ? ? ? ? ? ? ? ? ? ? CHALLENGE: NearSOLUTION EFFORT: Low • Siting: Identifying sites with low interconnection costs may be difficult for developers because they do not have sufficient information from utilities Black & Veatch - 14

  15. CHALLENGE: NearSOLUTION EFFORT: Low • Regulatory: The process for allocating and recovering cost is not necessarily defined. ? ? ? ? ? ? Black & Veatch - 15

  16. CHALLENGE: NearSOLUTION EFFORT: Low • Process:Lack of clarity between FERC and PUC jurisdiction • Process: Time consuming and costly interconnection procedures Black & Veatch - 16

  17. CHALLENGE: NearSOLUTION EFFORT: Low • Process: High volume of interconnection applications may overwhelm utilities • Process:Barriers to entry are low leading to many new developers entering the market. There may be a lack of understanding of issues for all parties Black & Veatch - 17

  18. CHALLENGE: NearSOLUTION EFFORT: Low • Protection:System protection schemes must coordinate DG with existing distribution system – reverse power flow Source: NREL Photovoltaic Systems Interconnected onto Secondary Network Distribution Systems Black & Veatch - 18

  19. CHALLENGE: NearSOLUTION EFFORT: Low • Voltage Regulation: Passing cloud cover affects grid voltage, potentially triggering protection devices and impacting system operation. Source: Electrical Impact of Photovoltaic Plant in Distributed Network, by Canova, Giaccone, Spertino & Tartaglia Black & Veatch - 19

  20. CHALLENGE: NearSOLUTION EFFORT: Low to High • Siting: Clustering of suitable PV sites. • Integration: PV generation is intermittent • Market: Lack of market penetration model* • Siting: Location of PV sites not known* *High effort Black & Veatch - 20

  21. CHALLENGE: NearSOLUTION EFFORT: Low to High • Siting: Large rooftops suitable for PV are often located in clusters which could limit their development Black & Veatch - 21

  22. CHALLENGE: NearSOLUTION EFFORT: Low to High • Integration: PV generation is intermittent and non-dispatchable Black & Veatch - 22 Image Source: Harmonic Response of Distributed Grid Connected Photovoltaic Systems by Patsalides, Stavrou, Makrides, Efthimiou & Georghiou

  23. CHALLENGE: NearSOLUTION EFFORT: High • Market: Market penetration model for PV does not exist, which impacts utilities and California planning processes. • Siting: Spatial distribution of potential PV installations, especially larger ones, is unknown. Black & Veatch - 23

  24. CHALLENGE: LongSOLUTION EFFORT: Low • Standards: Inverter specifications and standards could be improved • Integration: Need for monitoring & control of PV systems • Power Quality: Inverters outputting harmonics • Power Quality: Inverters Outputting incremental DC components Black & Veatch - 24

  25. CHALLENGE: LongSOLUTION EFFORT: Low • Standards: Inverter specifications and standards could be improved • Integration:High penetrations ofsolar may necessitate monitoring and control of PV systems Black & Veatch - 25 Image Source: Strategic Value Analysis for Integrating Renewable Technologies in Meeting Target Renewable Penetration, CEC

  26. CHALLENGE: LongSOLUTION EFFORT: Low • Power Quality: Inverters may inject harmonics into the grid reducing the power quality • Power Quality: Injection of DC component on the AC network could impact power quality Black & Veatch - 26 Image Source: Influence of Power Contribution of a Grid-Connected Photovoltaic System & its Operational Particularities, by Macedo, Zilles

  27. CHALLENGE: Long; SOLUTION EFFORT: High • Integration: Forecasting solar may be necessary. • Modeling: Lack of accepted models for PV generation on the distribution system. • Modeling: Lack of insolation data showing real-world conditions Black & Veatch - 27

  28. CHALLENGE: Long; SOLUTION: High • Integration: Forecasting solar resource may be necessary to control overall system. • Modeling: There is a lack of appropriate weather data, which inhibits analysis of real-world insolation conditions and system response. • Modeling: There is a lack of accepted or vetted equipment models to simulate large amounts of PV generation on the distribution system. Source: GE PSLF (http://www.turnkeymasters.com/bpa/tools.html) Black & Veatch - 28

  29. Challenges This Work Group Probably Won’t be able to Address • Operational: Each utility has different operating philosophies, loading protocols, etc, which makes it difficult for developers to implement projects across the state. • Market: The availability of qualified installers or certified equipment may create a bottleneck and slow installations or cause other problems. Black & Veatch - 29

  30. Possible Solutions: Intermittency, Dispatchability • Energy Storage • Curtailing Generation • Forecasting Solar Source: Solar Energy Grid Integration Systems, DOE EERE, Sandia National Laboratories Black & Veatch - 30

  31. Possible Solutions: Siting, Process, Regulatory, Other • Increase Information Available to Developers on Preferred Interconnection Locations • Institute a First Pass / Fatal Flaw Interconnection Application • Update Inverter Standards Black & Veatch - 31

  32. Possible Solutions: System Operation • Dedicated Feeder • Cluster Systems – Develop “Solar Grid Overlay” • Load Tap Changers, more Capacitor Banks • Low Voltage Ride Through • Smart Grid • Monitoring and Control • Re-Sectionalizing • Load Control Black & Veatch - 32