PH Building Assessment Buildings 25,70, 155, 166 and 187. Safety Analysis. Basis of Assessment. Building Inspection Report ODM’s TSO Risks Assessment TSO Report Visit Analysis. Criteria used during visit. Structure Roof, Façade, Walls, Floors, Windows, Doors, Corridors, Stairs

vin
Download Presentation

PH Building Assessment Buildings 25,70, 155, 166 and 187

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PH Building AssessmentBuildings 25,70, 155, 166 and 187 Safety Analysis

  2. Basis of Assessment • Building Inspection Report • ODM’s • TSO Risks Assessment • TSO Report • Visit • Analysis

  3. Criteria used during visit • Structure • Roof, Façade, Walls, Floors, Windows, Doors, Corridors, Stairs • Infrastructure • Electricity, Plumbing • Safety • Detection, Evacuation, Emergency Lighting, Signage, Fire Doors, Fire Fighting Equipment

  4. Buildings 25,70, 155, 166 and 1871 of 3 • Structure • Roof (wood/ethernite). Large crack (bldg 25). Some leaks from skylights. • Facade. Paintwork. • Windows. Rotting frames with single glazing. Some blinds to be replaced. • Bldg 70 is all wood construction. • Infrastructure • Electricity to be checked (circuit breakers)

  5. Buildings 25, 70, 155, 166 and 1872 of 3 • Flooring, mezzanine 155 – maximum load assessment • Access, paving (exterior) to be consolidated • Heating inefficient (Bldg 16, full renovation required)

  6. Buildings 25, 70, 155, 166 and 1873 of 3 • Conclusion • Large amounts of wood are employed in the construction of parts of this building complex (roofing, corridors, offices). • The long term viability of the complex should be assessed and if kept investment should be considered for fire detection, protection and evacuation.