Flood Taskforce

Flood Taskforce. Flood risk in Sumner and Moncks Bay. Outline. Flood Taskforce purpose Storm events Vulnerability levels Areas assessed Temporary flood defence toolbox Next steps Questions. Eastern Terrace - April 2014. Squire Street - June 2013. Flood Taskforce purpose.

walda
Download Presentation

Flood Taskforce

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Flood Taskforce Flood risk in Sumner and Moncks Bay

  2. Outline • Flood Taskforce purpose • Storm events • Vulnerability levels • Areas assessed • Temporary flood defence toolbox • Next steps • Questions Eastern Terrace - April 2014 Squire Street - June 2013

  3. Flood Taskforce purpose “ Assisting the most vulnerable homes to cope with the frequent flooding caused by the earthquakes”. Slater Street – June 2013

  4. Which areas were covered by the Flood Taskforce? • Lower Avon River • Dudley Creek (including Flockton) • Lower Heathcote (including Woolston/Opawa) • Upper Heathcote • Heathcote Valley • Southshore • Sumner (including Redcliffs) • Little River • Lyttelton

  5. Storm events since 1961

  6. Vulnerability Levels • Three vulnerability Levels for multiple flooding occurrences since the earthquakes

  7. Findings * Properties identified in the May 2014 Taskforce Report by Customer Service Requests; flood modelling confirmed by visual inspections. Note: 7 properties recorded as flooded above floor level once since earthquakes

  8. Flood Defence Toolbox

  9. Local Area Schemes for Wakefield / Paisley Area

  10. Wakefield Ave / Paisley St Area

  11. Wakefield Ave / Paisley St Scheme Phase 1 Recommendations • Removal of sediment from Sumner Stream • Increase inlet and pipe capacity of sumps outside 125 Wakefield Ave • Liaise with CERA to mitigate both short and long term sediment and runoff issues from Red Zone • Van Asch St bridge being replaced by SCIRT

  12. Mariner Street Area Cave Rock Outfall Cave Rock Drain Outfall Burgess Street Outfall

  13. Richmond Hill Drain / Mariner St Area Phase 1 Recommendations • Investigate options for improved outfalls at Cave Rock and Burgess St to to mitigate operational issues related to sand • Formalisation of the secondary flow path from Cave Rock Drain outfall (surf club) • Prepare specific operational and emergency response plan to document critical requirements for operation of the system

  14. Other Recommendations • Undertake immediate maintenance on SFRP flap gate to ensure fully operational • Investigate options for providing ability to manually open SFRP flap gate • Reinstate bolts on SFRP manholes

  15. Other Recommendations • Assess sediment levels and programme removal sediment and other constrictions from Sumner Main Drain between Truro and Colenso streets • Monitor sediment levels in SFRP once flap gate operational and programme cleaning if required • Cleaning out road side swale on Heberden Ave / Arnold St intersection to reduce runoff across road, possible footpath improvements same area to minimise runoff into private property (36a Heberden Ave)

  16. Next steps Flood Taskforce • Ongoing maintenance activities • Further investigations for solutions • Flooding recommendations delivered to Council and government Residents • Complete a survey • On-going contact • One-on-one meetings with engineers if a solution affects your property

  17. Questions? Call Centre: 03 941 8999 Website: www.ccc.govt.nz Email: floodmitigation@ccc.govt.nz