An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MARS Taskforce RMS Update September 15, 2010

  2. Definitions • AMC – • AMS (IDR) meter type settled using the 15-Minute LSE data received from TDSP • AMDG – • 15 Minute LSE data containing both generation and load values , also profile included DG with AMS (IDR) meter type • AMS data included Distributive Renewable Generation  • Estimated – • ERCOT estimated data because profile showed AMS (IDR) meter type, however the 15-minute LSE data wasn’t available in ERCOT’s Settlement system at the time the ESI ID was being processed for Settlement .   

  3. InitialSettlement As of August 31, 2010 Operating Date: August 23, 2010 • AMC ESI ID Totals: 1,354,318AMDG ESI ID Totals: 201 • Estimated ESI ID Totals: 3,916

  4. FinalSettlement As of August 31, 2010 Operating Date: July 5, 2010 • AMC ESI ID Totals: 1,045,384 • AMDG ESI ID Totals: 133 • Estimated ESI ID Totals: 1,522

  5. True-Up Settlement As of August 31, 2010 Operating Date: March 4, 2010 • AMC ESI ID Totals: 662,789 • AMDG ESI ID Totals: 75 • Estimated ESI ID Totals: 1,765

  6. AMS Meter Installation Status Report Oncor: • Installed: 1,251,838 as of 8.31.2010 • Deployment Plan: • 2010 – 929,000 meters • 2011 – 902,000 meters • 2012 – 902,000 meters

  7. AMS Meter Installation Status Report CenterPoint Energy: • Installed: 570,647 as of 9.02.2010 • Deployment Plan, includes projected growth: • 2010 – 756,684 meters • 2011 –   960,327 meters • 2012 –   373,423 meters

  8. AMS Meter Installation Status Report American Electric Power (AEP): • Installed: 73,123 as of 8.31.2010 • Deployment Plan schedule: • 2010 – 188,212meters • 2011 –   251,571 meters • 2012 –   279,329 meters • 2013 – 278,280 meters

  9. Market AMSInstalled Totals 1,895,608

  10. PUCT Project 34610 Advanced Metering Implementation Team (AMIT) Documentation & Meeting Schedules can be found on: • Public Utility Commission of Texas Project 34610 Website: • http://www.puc.state.tx.us/electric/projects/34610/34610.cfm

  11. Advanced Metering Implementation Team (AMIT) • September • 8 Project #2, Web Portal (Web Ex Only) • Review of Design Materials for SMT Release #3 • Wed: 9:30-5:30           • Location: Public Utility Commission, CHR, 7th Floor, {1701 N. Congress Ave, Austin, TX 78701} • 21-22 ALL PROJECTS (F2F) • Deep Dive into Roadmap & Strategic Re-alignment/ 3rd-Party Access Update • Tue: 9:30-5:30 • Wed: 9:30-4:30              • Location: Public Utility Commission, CHR, 7th Floor, {1701 N. Congress Ave, Austin, TX 78701}

  12. Important AMIT News!!!! • Deep Dive into Roadmap and Strategic Re-alignment • ALLAMIT PROJECTS: • Project 1 - Interim Project • Project 2 – Smart Meter Texas Web Portal • Project 3 - ERCOT “Interim” Settlement Solution • Project 4 – Home Area Network (HAN) • Project 5 - Retail Market Interface • Project 6 – Education • Project 8 – “Long Term” Settlement Solution