MARS Taskforce. RMS Update October 13, 2010. Definitions. AMC – AMS (IDR) meter type settled using the 15-Minute LSE data received from TDSP AMDG – 15 Minute LSE data containing both generation and load values , also profile included DG with AMS (IDR) meter type
E N D
MARS Taskforce RMS Update October 13, 2010
Definitions • AMC – • AMS (IDR) meter type settled using the 15-Minute LSE data received from TDSP • AMDG – • 15 Minute LSE data containing both generation and load values , also profile included DG with AMS (IDR) meter type • AMS data included Distributive Renewable Generation • Estimated – • ERCOT estimated data because profile showed AMS (IDR) meter type, however the 15-minute LSE data wasn’t available in ERCOT’s Settlement system at the time the ESI ID was being processed for Settlement .
InitialSettlement As of October 5, 2010 Operating Date: September 27, 2010 • AMC ESI ID Totals: 1,522,381AMDG ESI ID Totals: 229 • Estimated ESI ID Totals: 11,051
FinalSettlement As of October 5, 2010 Operating Date: August 9, 2010 • AMC ESI ID Totals: 1,282,123 • AMDG ESI ID Totals: 183 • Estimated ESI ID Totals: 1,764
True-Up Settlement As of October 5, 2010 Operating Date: April 8, 2010 • AMC ESI ID Totals: 721,360 • AMDG ESI ID Totals: 84 • Estimated ESI ID Totals: 2,100
AMS Meter Installation Status Report Oncor(approximately): • Installed: 1,343,458 as of 9.30.2010 • Deployment Plan: • 2010 – 929,000 meters • 2011 – 902,000 meters • 2012 – 902,000 meters
AMS Meter Installation Status Report CNP (approximately): • Installed: 661,238 as of 9.30.2010 • Deployment Plan, includes projected growth: • 2010 – 756,684 meters • 2011 – 960,327 meters • 2012 – 373,423 meters
AMS Meter Installation Status Report AEP (approximately): • Installed: 115,053 as of 9.29.2010 • Deployment Plan schedule: • 2010 – 188,212meters • 2011 – 251,571 meters • 2012 – 279,329 meters • 2013 – 278,280 meters
Market AMSInstalled Totals 2,119,749
PUCT Project 34610 Advanced Metering Implementation Team (AMIT) Documentation & Meeting Schedules can be found on: • Public Utility Commission of Texas Project 34610 Website: • http://www.puc.state.tx.us/electric/projects/34610/34610.cfm
September AMIT Deep Dive Meetings • Deep Dive into Roadmap and Strategic Re-alignment completed in September • ALLAMIT PROJECTS: • Project 1 - Interim Project • Project 2 – Smart Meter Texas Web Portal • Project 3 - ERCOT “Interim” Settlement Solution • Project 4 – Home Area Network (HAN) • Project 5 - Retail Market Interface • Project 6 – Education • Project 8 – “Long Term” Settlement Solution
Deep Dive Results • Deep Dive into Roadmap and Strategic Re-alignment completed in September • ALLAMIT PROJECTS:
Advanced Metering Implementation Team (AMIT) • October • 26-27th (F2F) • Tue: 9:30-5:30 • Wed: 9:30-5:30 • Location: Public Utility Commission, CHR, 7th Floor, {1701 N. Congress Ave, Austin, TX 78701} • Free Real-Time Video of Meetings available at: http://www.texasadmin.com/puct.shtml
Advanced Metering Implementation Team (AMIT) • November • 2nd (F2F) • Tue: 9:30-5:30 • Location: Public Utility Commission, CHR, 7th Floor, {1701 N. Congress Ave, Austin, TX 78701} • 16-17th (F2F) • Tue: 9:30-5:30 • Wed: 9:30-5:30 • Location: Public Utility Commission, CHR, 7th Floor, {1701 N. Congress Ave, Austin, TX 78701} • Free Real-Time Video of November Meetings available at: http://www.texasadmin.com/puct.shtml
Advanced Metering Implementation Team (AMIT) • December • 7th (F2F) • Tue: 9:30-5:30 • Location: Public Utility Commission, CHR, 7th Floor, {1701 N. Congress Ave, Austin, TX 78701} • Free Real-Time Video of December Meeting available at: http://www.texasadmin.com/puct.shtml