1 / 14

IBM SCPM MCV Page

Learn how to navigate the MCV page in IBM SCPM, including selecting date ranges, exporting data, configuring tables, viewing data measures, and accessing collaboration-related data.

waponte
Download Presentation

IBM SCPM MCV Page

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IBM SCPM MCV Page December 20, 2019

  2. Navigating the MCV Page 1. Calendar View Selectors 2. Refresh Button Tip: Selecting the Start Date and End Date on the MCV page only sets the date range for the current MCV page. You can set the default date range for all MCV pages at the User Preferences page.

  3. Navigating the MCV Page Export Icon 5. Data Measure View Tab 2. Time Buckets 1. Data Measures 4. Exception Alert 3. PIT (Point-in-time)

  4. Displaying Additional Data on the MCV Page A. Table Configurator • Click the Configure Collab View icon (A) to access the Table Configurator dialog box. • Select the additional data you want to view (B) and the sort order (C). • If you want, save your settings as default (D) and click the Update button (E). B. Data to View C. Sort Order E. Update D. Save as Default

  5. Displaying Additional Data on the MCV Page • The system displays the data in columns to the left of the Data Measures column (E). • If necessary click and drag to the right the Column Display icon (F) to view all the data. E. Display Area for additional columns F. Column Display

  6. Viewing Data Measures on the MCV Page The system displays the Data Measures column (G) to the left of the dates column. • Click and Data Measures icon to view all the options. • From the Display Data Measures list, click the Data Measure name that you do NOT want to view • Click the < arrow button to move the Data Measure to the Available Data Measure column • Click the Update button 2 G. Data Measures 3 1 4

  7. Collab Details Menu i A B C D E F • The Collab Details icon (i) provides access to collaboration-relateddata. • Message – attach a message to the collab • Collab Attribute – view the Material Master collab attribute values • Collab Description – view the collab dimensions • Site Attribute – view the Material Master • Autofill – Enter PIT data and view exceptions before submitting • Alternate Parts – view the alternate parts available for the collaboration

  8. Viewing Collab Message i 2 3 3 • Click the Collab Details icon to display the Collab Details dialog box. • Click Message to access the Message data. • Click the Subject line to read and reply to an existing message or • Click the Envelope icon to create a new message

  9. Viewing Collab Attribute Data 1 2 • Click the Collab Details icon to display the Collab Details dialog box. • Click Collab Attribute to access the Material Master data.

  10. Viewing Site Attribute Data 1 2 • Click the Collab Details icon to display the Collab Details dialog box. • Click Site Attribute to access the Site Attribute data.

  11. Viewing Alternate Parts 1 2 • Click the Collab Details icon to display the Collab Details dialog box. • Click Alternate Parts to access the Alternate Parts data.

  12. Viewing PIT Attributes A B • To view all PIT Attributes for a data measure, click the data measurename. • To view the PIT Attributes for a specific PIT, click the value in the PIT.

  13. Viewing PIT Attributes 1 2 At the PIT Info page, you can select the PIT Attributes you want to view: • From the User Fields box, click the PIT Attributes you want to view. • Click the Refresh button to refresh the view.

  14. Viewing the Summary Tab A • The Summary tab displays the rolled-up values for multiple collaborations you are viewing on the MCV page.

More Related