An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cape May County, NJ Initial Coordination Meeting FEMA Region II Mitigation Division September 29th, 2010 10:00-11:00

  2. Risk MAP Vision: Through collaboration with State, Tribal, and local entities, Risk MAP will deliver quality data that increases public awareness and leads to action that reduces risk to life and property • Purpose of this Coordination Call: To establish the awareness and understanding in the ongoing efforts to update Community’s flood risk analysis and mapping (ie. FIS and DFIRM). • Whois Involved: Federal/State/Local/Mapping Partners • Federal – FEMA, Region II Project Manager; Paul K. Weberg, PE Communications/Outreach Support; Adie Koby Technical Assistance; Alan Springett • State – NJDEP, Joseph Ruggeri, PE, CFM Supervising Engineer NJ State NFIP Coordinator's Office Bureau of Dam Safety & Flood Control Office of Engineering & Construction • Mapping Partner: RAMPP – Milver Valenzuela, PMP, CFM, GISP - Project Manager • Local – Cape May County & Communities Purpose

  3. WHY: maintain an up-to-date and accurate flood risk analysis and delineation for local decision makers in flood risk management. • This SUCCESS of this effort and outcome relies on the active participation of EACH COMMUNITY Purpose

  4. Overview of current Risk MAP status of Cape May County • Future projects and next steps • Questions & Feedback from the communities Objective

  5. Mapping partner to deliver preliminary maps to Cape May County communities in June, 2012 • Project Team • Risk Assessment, Mapping, and Planning Partners (RAMPP), a joint venture of Dewberry, URS, and ESP • Tasks -Redelineation -Restudy of all coastal hazard zones -FIS Report Production -Terrain data processing -DFIRM panel and database production -Preliminary DFIRM Production and Distribution Cape May County Preliminary Maps – Overview

  6. Incorporation of approximately 10 miles of riverine redelineation, 31 miles of approximate riverine, and 72 miles of detailed coastal analysis • Incorporation of NJFHA boundary to the DFIRM maps and Flood Insurance Report (FIS) profiles • The DFIRM and FIS report will be produced in the FEMA Countywide format in the North American Vertical Datum of 1988 (NAVD88) • NAVD 88 = NGVD 29 (-1.275 ft) Cape May County Preliminary Maps -Scope

  7. Storm Surge: Analysis of tropical and extratropical (northeasters) using ADCIRC model and JPM statistical model • Topography and bathymetry complete • ADCIRC mesh nearing completion • Statistical analysis of storms nearing completion • ADCIRC modeling expected to start in October 2010 • Overland Wave Hazard Analysis: Analysis of wave hazards along coastline. • Field reconnaissance complete Coastal Storm Surge and Overland Wave Hazard Analysis

  8. Cape May County – August, 2012 PreliminaryCountywide Paneling Scheme

  9. Cape May County – NFIP Policies, Claims, Repetitive Losses, CRS, CAC & CAV

  10. NJ - Mitigation Plan Status

  11. Current Status: • Hydrology is in advanced stages and Hydraulics is in initial stages. Revisions to USGS regression equations (basis for the Hydrology) have delayed the progress • Redelineation of riverine miles is in advanced stages. Mapping will be finalized when all other analyses are complete • Coastal analyses are currently ongoing. Transect layouts have been defined. Draft obstruction polygons have been produced. Field reconnaissance has been completed • Awaiting response from communities to the letters sent out in January, 2010 regarding data request Cape May County Preliminary Maps -Current Status

  12. Contacted each community letting them know about coastal field reconnaissance taking place in their communities in August 19, 2010, and data request back in January 6, 2010 • Only received response from City of Ocean City, • Is this an accurate representation of your communities? • Roles & Responsibilities of Local Communities: • Response to the letters sent out in January, 2010 • Flood Risk communications with residents Local Communities

  13. Target Dates • Next coordination call: March, 2011 • Coastal Surge completed by: October, 2011 • Coastal Overland completed by: January, 2012 • Preliminary maps to be distributed: June, 2012 Milestones

  14. The Road to Ordinance Adoption

  15. Preliminary delivery • Community Consultation Official (CCO) meeting • Initial 30-day comment period • Appeals & Protests • 6 month: FEMA 6-month Letter of Final Determination (LFD) • 5 month: NJDEP Assistance Letter • 3 ½ month: Draft Ordinance • 3 month: NJDEP review of draft ordinance • 3 month: FEMA 90-day Reminder Letter • 1 month: FEMA 30-day Reminder Letter • 0: Ordinance Adopted The Road to Ordinance Adoption

  16. NJ FY09 Projects • Similar meetings conducted: • Morris: April, 2010 • Bergen: June, 2010 • Somerset: June, 2010 • Essex: July, 2010 • Monmouth: August, 2010 • Union: August, 2010 • Future coordination calls with: • Middlesex, Passaic, Cumberland, Salem, Atlantic, Ocean Counties • Other project target dates for preliminary maps: • Morris and Bergen: June-September 2011 • Rest of the Counties: Early – Mid 2012 Recent Activities

  17. www.RAMPP-TEAM.com: PowerPoint Presentation & Fact Sheets & additional information will be posted • Next coordination meeting: March, 2011 Contact Information • FEMA Region II Paul Weberg, DHS/FEMA Region II 290 Broadway, 29th Floor New York, NY (212) 680-3638 Paul.weberg@dhs.gov • NJDEP office: John Scordato / Joseph Ruggeri / Chris Gould NJDEP, Bureau of Dam Safety & Flood Control (609) 292-2296 phone, (609) 984-1908 fax Visit NJDEP website: www.nj.gov/dep/floodcontrol Download Model Ordinances: http://www.nj.gov/dep/floodcontrol/modelord.htm Questions & Feedback