1 / 8

Field Deployable Hydrolysis System

Field Deployable Hydrolysis System. Edgewood Chemical and Biological Center. Background Info. What does it do? U.S. Army Edgewood Facility The project was initiated in February of 2013. Ideas Behind the Design. Lightweight Transportable Keeping set-up time to a minimum

wing-burns
Download Presentation

Field Deployable Hydrolysis System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Field Deployable Hydrolysis System Edgewood Chemical and Biological Center

  2. Background Info • What does it do? • U.S. Army Edgewood Facility • The project was initiated in February of 2013

  3. Ideas Behind the Design • Lightweight • Transportable • Keeping set-up time to a minimum • Using little resources

  4. Capabilities • Neutralizing Chemicals • Titanium reactor capable of pairing with other reactors • Chemical Warfare Agents

  5. Important Characteristics

  6. Significance of FDHS • Cost saving • Less risk • No need for boots on the ground

  7. Sources • http://www.gizmag.com/fdhs-mobile-chemical-weapons-neutralizer/29011/ • https://www.ecbc.army.mil/cbarr/newsletter/2013/CBARR_August2013.pdf • http://www.defensenews.com/article/20130904/DEFREG02/309040029/

More Related