Mechanical Preliminary Design Layout for MIPP Upgrade

Mechanical Preliminary Design Layout for MIPP Upgrade. Fermilab/PPD/MD by Jim Kilmer, Dave Pushka, Edward Chi April 28, 2007 http://home.fnal.gov/~edchi/E907-07/meeting/meeting1-mipp-042807.ppt. Overall view of the current M-center Jolly Green Giant Magnet area. Front Plastic

wyoungs
Download Presentation

Mechanical Preliminary Design Layout for MIPP Upgrade

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mechanical Preliminary Design Layout for MIPP Upgrade Fermilab/PPD/MD by Jim Kilmer, Dave Pushka, Edward Chi April 28, 2007 http://home.fnal.gov/~edchi/E907-07/meeting/meeting1-mipp-042807.ppt

  2. Overall view of the current M-center Jolly Green Giant Magnet area

  3. Front Plastic Ball Detector Back Plastic Ball Detector

  4. Needs more engineering details: Which ball ? Materials? Eng. drawings? Go to http://home.fnal.gov/~edchi/E907-07/dimensions%20and%20properties/ for more property details. Go to “

  5. Assume to use the “back plastic ball detector”: There is an interference with the current TPC support table

  6. Using two independent rail supports with movable top section in the top. (The existing table has to go)

  7. Option #1: Move the ball detector to the west side of the hall – The ball detector will have interference with the hall.

  8. Option #2: Move the plastic ball detector to the east – No interference w/ the hall, but has inter. with the existing cable tray.

  9. Option #3: Move the ball detector upward

  10. View from US to DS when the ball detector move up 64” (Y). View from the downstream to upstream while the ball detector moving upward 64” (Y direction).

  11. Option #4: The plastic ball detector stays in the US position; TPC move to the DS location.

  12. Four options - advantage, disadvantage, Which one? Specifications: repeatability (cost, time) Refrigerator, Hydrogen target – movable? Others?