100 likes | 285 Views
SKKU Lab - Meeting. SKKU Lab-meeting, 05 .March.2014 Dong- hyun Kim on behalf of the cern-904 team Department of physics, sungkyunkwan university, korea. Content. 1. Status of Korea-Chambers 2. Plan 3. Status of Data-analysis 4. Plan. 1. Status of Korea-Chambers.
E N D
SKKULab - Meeting SKKU Lab-meeting, 05.March.2014 Dong-hyun Kim on behalf of the cern-904 team Department of physics, sungkyunkwan university, korea
Content 1. Status of Korea-Chambers 2. Plan 3. Status of Data-analysis 4. Plan
1. Status of Korea-Chambers • Built a 1st Chamber( waiting to Cosmic-ray test)
1. Status of Korea-Chambers • 1st Chamber Gaps Dark current test results
1. Status of Korea-Chambers • 1stChamber Leak test results 0.15 mbar 0.2 mbar < Bottom – part > < Top – part >
1. Status of Korea-Chambers • Proceed to Mechanical prepare( For 10 Chambers )
1. Status of Korea-Chambers • Proceed construction - 2nd & 3rd Chambers with Bottom gap < BO78 & BO80 Dark current Test graph > < BO78 & BO80 Leak Test graph >
2. Plan • Cosmic-ray test with 1st Korea-Chamber • Start build 2nd & 3rd Chamber with Bottom gap on today • Next week, provide QC4 with 3 Chambers ( Until 7.March provide 1st chamber Until 12.March provide 2nd & 3rd chamber )
3. Status of Data-Analysis • W boson study • Search MC data samples( 13TeV ) • Pythia 6 & pythia 8 • dataset=/*WToMuNu*13TeV_pythia*/*/*AOD* • PYTHIA 6: /WToMuNu_TuneZ2star_13TeV-pythia6/Summer13dr53X-PU25bx25_START53_V19D-v1/AODSIM -> Download has a problem (Tier1 site) • PYTHIA 8: /WToMuNu_Tune4C_13TeV-pythia8/Fall13dr-tsg_PU20bx25_POSTLS162_V2-v1/AODSIM -> Download
4. Plan • Cross check Pythia 6 & Pythia 8