70 likes | 191 Views
SKKU Lab - Meeting. SKKU Lab-meeting, 18.June.2014 Dong- hyun Kim on behalf of the cern-904 team Department of physics, sungkyunkwan university, korea. 1. Status of RPC Study. RPC current study. Ramp. 1. Status of RPC Study. RPC current study. < Current graph >.
E N D
SKKULab - Meeting SKKU Lab-meeting, 18.June.2014 Dong-hyun Kim on behalf of the cern-904 team Department of physics, sungkyunkwan university, korea
1. Status of RPC Study • RPC current study Ramp
1. Status of RPC Study • RPC current study < Current graph > < HV & Current graph >
1. Status of RPC Study • HV effect study - @ 1 kV HV, current is 0.3
1. Status of RPC Study • RPC current study on EP1/EP2 – cosmic(9500kV),standby(7000kV) < EP1 average HV & Current graph > < EP2 average HV & Current graph >
1. Status of RPC Study • Problematic channelscurrent study < EP1 R2 C03&C04 HV & Current graph > < EP2 R2 C03&C04 HV & Current graph >
2. Status of Data analysis • MCFM generated jobs too much failed • 240 jobs submitted and 220 jobs failed • Still study about How to set the MCFM option and method