EL HORMIGON EN OBRA

: OBJETIVO. ENTREGAR CONOCIMIENTOS BASICOS DEL MATERIAL HORMIGON. EL HORMIGON EN OBRA. CONSTRUCCION GENERAL II. MANIPULACION DEL HORMIGON FRESCO EN OBRA. PARA OBTENER EL HORMIGON FRESCO EN OBRA SE DEBE TENER PRESENTE LOS SIGUIENTES FACTORES: Almacenamiento de materiales Fabricación

yaron
Download Presentation

EL HORMIGON EN OBRA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. : OBJETIVO. ENTREGAR CONOCIMIENTOS BASICOS DEL MATERIAL HORMIGON EL HORMIGON EN OBRA CONSTRUCCION GENERAL II MAVA

  2. MANIPULACION DEL HORMIGON FRESCO EN OBRA PARA OBTENER EL HORMIGON FRESCO EN OBRA SE DEBE TENER PRESENTE LOS SIGUIENTES FACTORES: • Almacenamiento de materiales • Fabricación • Transporte • Ejecución • Colocación • Compactación • Terminación superficial • Curado

  3. ALMACENAMIENTO DEL CEMENTO BODEGAS: • Cerradas, cubiertas impermeables con pendiente y aleros mínimo 80 cm. • Incorporar vías de circulación para el retiro de bolsas y aireación • Piso entablado aislado del suelo para evitar humedad • Almacenar en pilas de 10 a 12 bolsas, aislada y separadas de la pared para circulación del aire, 25 cm. • Almacenar entre 3 a 6 meses, dependiendo de la humedad • Uso del cemento de acuerdo a fecha de llegada.

  4. CEMENTO A GRANEL • EN SILOS CILINDROS CERRADOS PARA EVITAR LA HUMEDAD CON SISTEMAS DE DISPOSITIVOS PARA PERMITIR EL FLUJO UNIFORMEY SISTEMA DE PARADA. LIMPIAR CADA MES E INCORPORARBOCA DE VACIADO. • EN BIG BAGS DE 1.500 KG.

  5. ALMACENAMIENTO DEL AGUA NCH 1498 • USO DE AGUA POTABLE • EN DEPOSITO DEBE CUBRIRSE PARA NO CONTAMINAR • LIMPIAR EL DEPOSITO MINIMO UNA VEZ A LA SEMANA. • PROTEGER DE TEMPERATURAS EXTREMAS. • ANTE DUDAS ENVIAR MUESTRA 2 LTS. A LABORATORIO OFICIAL.

  6. ALMACENAMIENTO DE ARIDOS PARA EVITAR SEGREGACION O FRAGMENTACION • SEPARAR MINIMO EN GRAVA Y ARENA • SEPARAR ENTRE GRAVA GRAVILLA Y ARENA • MOVER ARIDOS CON CARGADOR FRONTAL • NO CIRCULAR SOBRE LOS ARIDOS • EVITAR CAIDA VERTICAL DESDE ALTURA • SITUAR ACOPIOS CERCA DE LA PLANTA DE HORMIGON • EVITAR QUE EL ARIDO RUEDE AL VACIARLO • ARENA DEBE MANTENERSE HUMEDA PARA QUE EL VIENTO NO LA SEGREGUE • SE DEBE RETAMIZAR EL ARIDO GRUESO SI SUFRE DEGRADACION (exceso de finos en el arido grueso)

  7. ALMACENAMIENTO DE ARIDOS PARA EVITAR CONTAMINACION • Limpieza de vehículos de transporte de áridos • Áridos acopiarlos sobre suelo sin polvo • Regar caminos cercanos de tierra

  8. ALMACENAMIENTO DE ARIDOS PARA EVITAR VARIACION DE CONTENIDO DE HUMEDAD • MANTENER ESTABLE HUMEDAD DE LA ARENA, MEDIANTE DRENAJE ADECUADO • PAVIMENTO DEBE TENER PENDIENTE PARA ESCURRIR EXCESO HUMEDAD

  9. ALMACENAMIENTO DE ARIDOS EVITAR PERDIDA DE TRABAJABILIDAD Tº del hormigón • Áridos gruesos riego permanente • Poner atención por concentración de finos • Retirar capa fina cada cierto tiempo • Orientar los acopios al sur para disminuir temperatura de los áridos.

  10. NORMAS NCH • NCH 163. TAMIZADO Y CONTROL GRANULOMETRICO • NCH 1223. DETERMINACION DE FINOS MENOR QUE 0,080 MM • NCH 166. PRESENCIA DE IMPUREZAS ORGANICAS EN LAS ARENAS • NCH 1116. DETERMINACION DE DENSIDAD APARENTE • NCH 1117. DETERMINACION DE LA DENSIDADREAL Y NETA Y ABSORCION DE AGUA DE LAS GRAVAS • NCH 1239. IDEM ANTERIOR PARA LAS ARENAS • NCH 1326.TERMINACION DE HUECOS

  11. ALMACENAMIENTO DE ADITIVOS • SEGUIR RECOMENDACIONES DEL FABRICANTE • CONSERVAR BAJO TECHO, AMBIENTE SECO, VENTILADO Y FRESCO. • PAVIMENTO TABLONES VENTILADO • VERIFICAR VIGENCIA • USAR CRONOLOGICAMENTE • EXTREMAR PRECAUCION EN PRODUCTOS EN POLVO. PRECAUCIONES SIMILAR AL CEMENTO.

  12. FABRICACION DEL HORMIGON ETAPAS DE FABRICACION • DISEÑO DE LA MEZCLA • MEDICION • MEZCLADO • TRANSPORTE • COLOCACION • COMPACTACION • TERMINACIOON SUPERFICIAL • CURADO

  13. MEZCLADO CONSIDERACIONES • OBTENER MATERIAL HOMOGENEO Y CONSISTENTE • DETERMINAR ORDEN DE CARGUIO • DETERMINAR TIEMPO OPTIMO REVOLTURA • LIMPIEZA DE HORMIGONERA AL FIN DE LA JORNADA