Safety and Mission Assurance

Safety and Mission Assurance. Jorg Fischer Space Sciences Laboratory University of California, Berkeley. Safety, Alerts, and Calibration. EFW Boom and Preamp Safety No safety issues at this time Safety per EFW Matrix, 7470-9096-05 Revision A, Section 3

yovela
Download Presentation

Safety and Mission Assurance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Safety and Mission Assurance Jorg Fischer Space Sciences Laboratory University of California, Berkeley

  2. Safety, Alerts, and Calibration • EFW Boom and Preamp Safety • No safety issues at this time • Safety per EFW Matrix, 7470-9096-05 Revision A, Section 3 • No hazardous ground operations for EFW • UC Berkeley’s EH&S checked test areas in May 2010 • Portable, calibrated Oxygen sensors are available for N2 purge • Test Plan Walk-through • Alerts and GIDEP Reports • No Alert impacts at this time • EFW receives Monthly Alerts from GSFC - JHU/APL • 177 Alerts received, 177 Alerts closed, 1 Impact – 1 impact closed • Calibration Control • All Tools need for testing are in calibration • Calibration Database (187 items tracked for EFW)

  3. ESD, Training, Configuration Control • ESD Control • ESD Workbenches are clearly Identified • ESD Workbenches are independently certified (RMV Technology) • ESD Control plan per ANSI/ESD S20.20 in place (SSL_QA_0003) • Internal ESD checks per plan • All EFW personnel ESD trained and certified to ANSI/ESD S20.20 • Training • All EFW personnel ESD trained and certified to ANSI/ESD S20.20 • All EFW technicians trained and certified to NASA Workmanship Standards • Configuration Control • Configuration Control Matrix, typ. shows revision of Schematic, BOM, PWA Gerber, ACI, Unit Name and Serial Numbers, Next Assembly • Latest version of documents and procedures are on the EFW server

  4. Traceability, Non-conformance Control • Traceability • All EEE parts approved • All Materials Approved • PMPCB process • POs and As built parts List on file • EFW Parts data base • Nonconformance Control • Proven, in-place PFR Process (STEREO, RHESSI, THEMIS) • MRB part of this process • PFR – Rework/Repair forms • 13 PFRs closed • PFRs on UCB server • PFRs are part of the SSL Lessons Learned Process

  5. Summary  Experienced Personnel provide oversight and technical support across all elements of the EFW Project  Mission Assurance Requirements are well defined and comprehensive.  These are traditional requirements for SSL Missions and they are understood.  Systems with experienced personnel are in place and operating. The Mission Assurance team is ready to support RBSP EFW Environmental Tests

  6. This page intentionally almost blank