1 / 14

TTL1 Transfer Line: Preliminary Design

TTL1 Transfer Line: Preliminary Design. C. Hessler, M. Meddahi, B. Goddard, PS2 meeting 12.03.2009. Thanks to: W. Bartmann, M. Benedikt, M. Eshraqi, F. Gerigk. Driving Parameters. Expression fractional loss from A.J. Jason et al, IEEE Trans.Nucl.Sci. NS-28, 1981

yvonne
Download Presentation

TTL1 Transfer Line: Preliminary Design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TTL1 Transfer Line: Preliminary Design C. Hessler, M. Meddahi, B. Goddard, PS2 meeting 12.03.2009 Thanks to: W. Bartmann, M. Benedikt, M. Eshraqi, F. Gerigk

  2. Driving Parameters Expression fractional loss from A.J. Jason et al, IEEE Trans.Nucl.Sci. NS-28, 1981 http://ieeexplore.ieee.org/stamp/stamp.jsp?arnumber=4331890&isnumber=4331887 PS2 meeting 12.03.2009 - TE/ABT/BTP

  3. TTL1 Beam Line Geometry 100 m horizontal bending magnets injectionchicane magnet SPL end point H1 beam H2 V1 V2 point C vertical bending magnets PS2 meeting 12.03.2009 - TE/ABT/BTP

  4. TTL1 Beam Line Geometry 100 m horizontal bending magnets injectionchicane magnet SPL end point H1 beam H2 V1 V2 point C vertical bending magnets → Design compatible with LP-SPL and HP-SPL → Maximum slope of 7.7% PS2 meeting 12.03.2009 - TE/ABT/BTP

  5. TTL1 Beam Line Geometry SPS TT11 transfer line PS2 y (m) TT10 TTL1 transfer line point C TI 2 x (m) PS2 meeting 12.03.2009 - TE/ABT/BTP

  6. Beam and Twiss Parameters SPL end point (Source: M. Eshraqi): Injection point (Source: W. Bartmann): PS2 meeting 12.03.2009 - TE/ABT/BTP

  7. Optics Simulation Fodo lattice → 25 m cell length→ 90° phase advance per cell 2 matching sections PS2 meeting 12.03.2009 - TE/ABT/BTP

  8. Optics Simulation PS2 meeting 12.03.2009 - TE/ABT/BTP

  9. Optics Simulation PS2 meeting 12.03.2009 - TE/ABT/BTP

  10. Quadrupole Families PS2 meeting 12.03.2009 - TE/ABT/BTP

  11. Aperture Calculation x y beam envelope (m) s (m) PS2 meeting 12.03.2009 - TE/ABT/BTP

  12. Trajectory Correction Scheme (on-going) correctors bending magnet • Quadrupole displacement errors: Gaussian distribution in x/y with s = 0.2 mm, cut at 3s • Dipole field errors: Gaussian distribution of deflection with s = 10 µrad, cut at 2s (→ relative field error of 5e-4) • Dipole tilt errors: Gaussian distribution with s = 0.2 mrad, cut at 4s • Monitor errors: Flat random distribution of ±0.5 mm in both planes BPMs quadrupoles Assumed errors: PS2 meeting 12.03.2009 - TE/ABT/BTP

  13. Trajectory Correction: Results uncorrected: x: 1.4 mm rms y: 2.8 mm rms corrected: x: 0.013 mm rms y: 0.029 mm rms max. corrector strength: x: 5.7e-02 mrad y: 4.9e-02 mrad PS2 meeting 12.03.2009 - TE/ABT/BTP

  14. Next Steps • More detailed study of the trajectory correction scheme • BI specifications • Magnet specifications • Momentum collimation • Space charge effects with ABP colleagues • Rebunching / phase rotation • Beam loss estimates/maps • Optimisation investigations (e.g. compacting bends?) PS2 meeting 12.03.2009 - TE/ABT/BTP