1. PREVIOUS, CURRENT AND FUTURE I&C ACTIVITIES IN OLKILUOTO NPPS
2. TIMELINE OF THE I&C RENEWALS AND MODERNIZATIONS
3. ONGOING I&C RENEWALS AND MODERNIZATIONS Turbine automation modernization including Main Control Room changes; OL2 2005, OL1 2006
Increasing capacity of Process Computer System: The old VAX-computers will be replaced with new Alpha-computers during 2005-2006
Renewing of radiation monitoring system during 2006-2007
Renewing of O2, H2 and dew point measurements in RPS during 2006 and 2007
4. OL1/OL2 TARMO PROJECTTURBINE AUTOMATION MODERNIZATION
5. Process is not changed. Only changes due to new HP-turbine and HP-heaters are included (project TIMO)
SUB-division is not changed
Interfaces to other systems are made according to normal approved practise (ex. galvanic isolations)
Installation will be made first to the simulator – training of operators and testing
System is STUK safety level 4 (documentation to STUK only for information)
6. TARMO - SCOPE The original turbine plant control systems (Decontic, Turbomat, process controllers) will be replaced with new systems (Siemens TXP) based on programmable technology
The traditional control desks will be replaced with desks with work stations (control via screens)
Automation functions are not changed. In some cases possibilities of the new technology will be used (starting and stopping sequences of pumps, etc.)
The process instrumentation is not changed
42 positioners of pneumatic control valves are renewed
8. TARMO – PROJECT SCHEDULE Contract 2002
Preparing installations (OL2 and OL1) 2004-2005
Simulator installation (OLKS) 2004
Training of TVO staff 2004-2005
Installation and commissioning (OL2) 2005
Installation and commissioning (OL1) 2006
9. MAIN CONTROL ROOM AFTER TURBINE AUTOMATION CHANGES
10. COMING I&C MODERNIZATIONS Renewal of the weather station, 2006
Due to OL3 capacity of the spent fuel storage has to be increased before 2010. This includes also modernization of logic of the fuel handling equipment as well as control of water handling system
Temperature sensors (Danfoss RT102 under study) and level sensors in RPS
Reactor Automation and Protection System system modernization after OL3 project, estimated 2012-2016
11. OL3 – CONSTRUCTION PROCESS
12. OL3 – CONSTRUCTION PROCESS (NOT MUCH I&C YET)