An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report on the Online Group Jean-Sebastien Graulich, Geneva • Introduction • Organization • Progress so far Jean-Sébastien Graulich

  2. Introduction Mission Statement • Make sure that the state of the control room (Hardware, Software and Documentation) allows efficient data taking, data quality control and subsequent data analysis Composition • Group leader (J.S. Graulich) • Point of contact for the MOM and the shifters for Online issues • Point of contact for the detector to include their data in the Online data stream and in Control and Monitoring System • DAQ (J.S. Graulich) • Control and Monitoring (James Leaver and Pierrick Hanlet) • Online Reconstruction (Linda Coney) • Control Room Management (Craig McWaters) Jean-Sébastien Graulich

  3. Organization Weekly phone meetings • On Thursday at 15:00 UK time (when no VC) Mailing list • Mice-dcm@mice.iit.edu Web page • http://mice.iit.edu/online/ • Still under construction Jean-Sébastien Graulich

  4. Priority tasks (Re)Organize network in MLCR Target DAQ (Target Position and Beam Loss Monitors) into Data Stream EPICS Archive and Alarm Handler for magnet currents Online Reconstruction Farm: Hardware/software Installation DAQ / EPICS interface Unified User Interface for Control and Monitoring Write Use Cases for the Control and Monitoring system Interface DAQ/Configuration Database/Online Reconstruction Data Transfer to Permanent Storage Jean-Sébastien Graulich

  5. Progress so far Target DAQ • James Leaver provided the I/O library allowing sustainable compatibility between the stand alone target DAQ and the DATE DAQ • Pierrick Hanlet provided the EPICS application allowing display of the target data in the EPICS framework • JSG is implementing the DATE readout code Jean-Sébastien Graulich

  6. Progress so far (2) Integrated GUI • James Leaver proposed the installation of an EPICS Client Server where all the Control and Monitoring applications will be installed and run from a unique interface • This server will also host the archive • The server has been ordered • Pierrick Hanlet has started working on the Graphical Interface Jean-Sébastien Graulich

  7. Progress so far (3) Control Room • Craig McWaters has proposed to upgrade the connection distribution service in Control Room (main power plugs and network sockets) • He also started the survey on the network installation Jean-Sébastien Graulich