First Call for Proposals

First Call for Proposals Improving services in the informal areas, enhancing employability and promoting income generation Training Session (First day) 13 November 2013. Ministry of Planning . European Union. Concept Note. AGENDA . How to develop a Concept Note How to Apply .

adli
Download Presentation

First Call for Proposals

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. First Call for Proposals Improving services in the informal areas, enhancing employability and promoting income generationTraining Session (First day)13 November 2013 Ministry of Planning European Union

  2. Concept Note

  3. AGENDA How to develop a Concept Note How to Apply

  4. General Comments

  5. Does not exceed 5 full pages (A4 size) of Arial 10 characters with 2 cm margins, single line spacing; Typed and written in ENGLISH Only the CN will be evaluated so it is of UTMOST IMPORTANCE that all the important elements regarding the action are contained therein Please follow the template in PART A of the Application Form

  6. Concept Note provides the information requested under the headings below, in the order in which it is requested, and in proportion to its relative importance (see the relevant scores set out in the evaluation grid and in the Guidelines); provides full information (as the evaluation grid will be applied solely on the information in the concept note); is drafted as clearly as possible to enable it to be evaluated.

  7. sectionsConcept Note

  8. 1. SUMMARY OF THE ACTION (Max 1 page)

  9. Title of the action and Lot Number Location Total duration of the action EU financing requested EU financing requested as a percentage of total budget of the Action (indicative) Objectives of the action Target group(s) Final beneficiaries Estimated results Main activities 1. SUMMARY OF THE ACTION (MAX 1 PAGE)

  10. Title of the Project • This is not an important section; nevertheless, your title should be brief, clear and interesting and unambiguous (Do not make it "cute"). • Think of your title as a mini-abstract. A good title should paint a quick picture for the reader of the key idea(s) of your project. • The words you use in your title should clearly reflect the focus of your proposal. • The most important words should come first, then the less important words. • Notice that both of the following titles use basically the same words, except in a different order. • The project with Title Number 1 appears to be focused on women. The project with Title Number 2 appears to be focused on the promotion of self-employment. However, both projects are the same! Make sure your words are in the correct order and clearly reflect what your project is about. • Title 1 Women and the Promotion of Self-Employment • Title 2 Promoting Self-Employment among women

  11. Location of the action In this section you describe the region in which the project will be implemented and which will benefit from the project. It is important to be realistic when deciding the number and /or size of the region(s). Duration of the action In months and make sure your stated duration is in conformity with that stated in the Guidelines for Applicants.

  12. EU Financing requested (amount) Make sure that the amount requested for the particular lot is within the limits given in the Guidelines for Applicants and that it matches the figure given in the first column of the summary table at the front of the application form. Be absolutely sure that this does not exceed the maximum or minimum amounts or the maximum percentage (80%) specified in the Guidelines for Applicants. All the figures you insert in this table should correspond exactly to those you present in the Budget for the project and, in fact, these figures should only be inserted after you have completed the budget.

  13. Objectives of the Action The overall objective describes your project’s broad and long term objective in the wider policy context. It gives the answer to the question “Why is the project important? The overall objective states the overall development aim towards which your more specific project purpose should contribute. Overall objectives commonly begin with the following wording: “To make a contribution to….”

  14. Objectives of the Action • Important things to remember about the overall objective are: • You cannot achieve the general objective or goal on your own as a project organisation. Your project will make a contribution towards achieving it. • The general objective or goal provides a benchmark against which the success of your project and that of others with a similar purpose can be measured. • The overall objective or goal should be compatible with your organisation’s mission statement and with the overall objective of call for proposals (Section 1.2 of the Guidelines for Applicants).

  15. The specific objective • The specific objective is usually something that your project should be able to achieve through its work. • It is an outcome that should be possible in the time specified, and it is the strategy the organization and the project believe will address a particular problem in a particular area, making a contribution to achieving the overall objective or goal. • Remember a good specific objective usually states: • What you want to achieve (your ends) • How you want to achieve it (your means) • Who the final beneficiaries will be.

  16. “Target groups” are the groups/entities who will be directly benefit from the action at the action purpose level. “Final beneficiaries” are those who will benefit from the action in the long term at the level of the society or sector at large

  17. Estimated results You need to be brief here but include all of the expected results you specified in the next section (Description of the Action, line 6). Main Activities List the main activities using the activities that you have listed at in the next section (Description of the Action, line 6). The activities you describe here should also correspond to those listed in the Action Plan at Section 2.1.3.

  18. The best time to prepare the Project Summary is after you have completed the entire project design and development (and you understand all aspects of your project very well). Try to keep in mind that someone will be reviewing your proposal and you would like to have this person be very positive about what you have written.

  19. The Project Summary will probably form a strong impression in the mind of the evaluator. • Work on your Project Summary so that you can avoid giving this person the opportunity to say things like: • Not an original idea • Problem is not important • Rationale is weak • Results are vague and uncertain • Does not have relevant experience • Proposal is unfocused.

  20. 2- DESCRIPTION OF THE ACTION (Max 1 page)

  21. 1. DESCRIPTION OF THE ACTION (max 1 page) Give the background to the preparation of the action. Explain the objectives of the action Describe the key stakeholder groups, their attitudes towards the action and any consultations held with them. Briefly state the type of activities proposed and specify related outputs and results, including a description of linkages/relationships between activity clusters. State the broad timeframe for the action and describe any specific factor that has been taken into account.

  22. Give the background to the preparation of the Action • Explain here how you went about preparing the project. • Was the project developed by an individual or by a by a committee or panel with one person doing the writing of the proposal. • Detail other organisations involved in the development process and describe the number of meetings held to discuss project design, etc. • Projects should not be developed without consultation with key stakeholders and representatives of the target group(s).

  23. Explain the objectives of the action given in the table in Section 1.1. Elaborate here on the objectives referred to in the table in section 1.1 above taking into account the advice given on formulating and writing objectives in section 1.1.

  24. Describe the key stakeholder groups, their attitudes towards the action and any consultations held with them. Good practice requires the project to be based on consultations with the target groups – surveys, interviews, focus groups, etc. Therefore, in this section explain in what ways you have already had contact with the target group, in what ways have members of the target group been involved in the preparation of the proposal and show that you have the support of the target group to move ahead with the project. If, in the project preparation stage you conducted a special needs assessment survey or have tested the project methods, do not forget to attach a short report on the survey in your proposal

  25. Briefly states the types of activities proposed and specify related outputs and results, including a description of linkages/relationships between activity clusters. In this section you need to describe what the project will do (the activities) in order to deliver its intended objectives. Only describe those activities that lead to concrete results. Provide a title and brief description of each activity to be undertaken to produce the results you specified in the table in 1.1, specifying, in particular, the role of co-applicant(s) (or associates and/or affiliates) in the implementation of activities and related results / outputs.

  26. State the broad timeframe for the action and describe any specific factor that has been taken into account. Your description of activities should be sufficiently detailed to allow evaluators and monitoring officers to understand exactly what you are intending to do and also to allow them to make an assessment of the costs you have allocated to each activity. The description of each activity should be detailed and specific and should give an answer to the following questions: What? How? How many? Where? Who? How long? When?

  27. 3. RELEVANCE OF THE ACTION (Max 3 page) 30 POINTS

  28. RELEVANCE OF THE ACTION 1.1.1 Relevance to the objectives/sectors/themes/specific priorities of the call for proposals 1.1.2 Relevance to the particular needs and constraints of the target country/countries, region (s) and/or relevant sectors (including synergy with other EU initiatives and avoidance of duplication) 1.1.3. Describe and define the target groups and final beneficiaries, their needs and constraints and how the action will address these needs 1.1.4. Particular added-value elements

  29. 1.1.1 Relevance to the objectives/sectors/themes/specific priorities of the call for proposals Describe the relevance of the action to the objective(s) and priority (ies) of the call for proposals. It is absolutely imperative that the overall and specific objectives of your project are very close and in compliance with the overall and specific objectives and priorities of the current call for proposals and you should clearly identify these from the guidelines for Applicants in respect of the call for proposals.

  30. 1.1.1 Relevance to the objectives/sectors/themes/specific priorities of the call for proposals Describe the relevance of the action to any specific subthemes/sectors/areas and any other specific requirements stated in the Guidelines for the call, e.g., local ownership etc. This will not be the case for all calls and if the call you are addressing does not then do not write anything under this question. However, certain calls for proposals there will be a reference to sub-themes/sectors/areas. If that is the case, make it clear how your proposed project addresses these requirements.

  31. 1.1.1 Relevance to the objectives/sectors/themes/specific priorities of the call for proposals Describe which particular expected results referred to in the Guidelines for the call will be addressed. Calls for proposals will also specify that the programme under which the call is funded is designed to achieve certain results. If this is the case, then try and demonstrate how your project will make a contribution to that result. This will not be the case for all calls and if the call you are addressing does not then do not write anything under this question.

  32. 1.1.1 Relevance to the objectives/sectors/themes/specific priorities of the call for proposals Describe/highlight eventual changes of the information provided in the concept note (this only applies in the case of a restricted call for proposals) It is important that you clearly identify anything that has changed in the concept note in relation to your project design or budget

  33. 1.1.2 Relevance to the particular needs and constraints of the target country/countries, region (s) and/or relevant sectors (including synergy with other EU initiatives and avoidance of duplication) State clearly the specific pre-project situation in the target country/countries, region(s) and/or sectors (include quantified data analysis where possible). In order to complete this section you will need access to basic statistics on the situation at both local and, if possible municipal/district and national level. However, in the context of your project, the situation at the level which your project plans to address is the most important

  34. 1.1.2 Relevance to the particular needs and constraints of the target country/countries, region (s) and/or relevant sectors (including synergy with other EU initiatives and avoidance of duplication) Provide a detailed analysis of the problems to be addressed by the action and how they are interrelated at all levels. In this sub-section provide a clear statement of the problem to show that your proposed project is definitely needed and should be funded. You should give an analysis of the target region / target groups answering the following questions: What are the main problems affecting the target group or target region? What are the causes of the problems? What are the effects of the problems? What are the possible solutions?

  35. 1.1.2 Relevance to the particular needs and constraints of the target country/countries, region (s) and/or relevant sectors (including synergy with other EU initiatives and avoidance of duplication) In addressing the point above, refer to any significant plans undertaken at national, regional and/or local level relevant for the action and describe how the action will relate to such plans. Here you should concentrate on the pre-project situation in your region/district/municipality and check if there are existing strategies which relate to the issue being addressed by your project and / or the call for proposals. If such strategies exist then explain how your project will contribute to the implementation of that strategy. If no such strategies exist, make this clear in your answer.

  36. 1.1.2 Relevance to the particular needs and constraints of the target country/countries, region (s) and/or relevant sectors (including synergy with other EU initiatives and avoidance of duplication) Where the action is the continuation of a previous action clearly indicate how the proposed action is intended to build on the activities/ results of this previous action; refer to main conclusions and recommendations of evaluations that might have been carried out.

  37. 1.1.3. Describe and define the target groups and final beneficiaries, their needs and constraints and how the action will address these needs Give a description of each of the target groups and final beneficiaries (quantified where possible), including selection criteria. Identify the needs and constraints of each of the target groups and final beneficiaries. Demonstrate the relevance of the proposal to the needs and constraints of the target groups and final beneficiaries. Explain any participatory process ensuring participation by the target groups and final beneficiaries.

  38. 1.1.4. Particular added-value elements • In this section you are asked to indicate any added value elements value elements, in particular any specific added-value elements, e.g. the promotion or consolidation of public-private partnerships, innovation and best practice, or other cross-cutting issues such as environmental issues, promotion of gender equality and equal opportunities, the needs of disabled people, the rights of minorities and the rights of indigenous peoples. These could be: • Implementation of new effective approaches to a certain problem; • Application of good practice models from other regions or countries; • Promotion of gender equality; • Promotion of equal opportunities for people with disabilities

  39. Concept Note – Evaluation Grid (6)

  40. How to apply Applicants prepare an envelope including: Concept Note- one original + 2 copies + electronic version on CD-Rom Checklist – one original completed Applicant declaration – one original completed and signed

  41. How to apply The outerenvelope must show: the referencenumber and the title of the call for proposals the full name and address of the applicant the words "Not to beopenedbefore the opening session" and "لا تفتح قبل جلسة فتح المظاريف” Concept Notes must be submitted in a sealed envelope by: registered mail private courier service hand-delivery Address: GIZ Participatory Development Programme 12 SalehAyoub Str., 5th floor, app. 12 11211 Zamalek, Cairo

  42. Questions • Questions about the Calls may be sent by e-mail to: grant.queries@gizeg.com • Deadline to submit questions: 15 December 2013 • GIZ has no obligation to provide further clarifications after this date. • Replies to Frequently Asked Questions (FAQ) will be published on: https://webgate.ec.europa.eu/europeaid/online-services/index.cfm?do=publi.welcome http://egypt-urban.net/grants-calls-for-proposals

  43. Final Tips Read the Guidelines very carefully: ALL THE INFORMATION PRESENTED TODAY IS THERE!!! Read the Application Form (Annex A) very carefully Read the General Conditions of the draft contract very carefully Check the EuropeAid and GIZ websites regularly for updates on Frequently Asked Questions, corrigenda, or modifications to the calendar Ensure that your contact details are up to date to facilitate correspondence Use the checklist for Concept Note to ensure that you meet all the administrative requirements GIZ cannot advise on the eligibility of applicants, partners or actions