An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CALO Piquet News 17 November 2009 Pascal Perret LPC Clermont

  2. CALO Piquets • We have a pool of ~20 piquets for 2009-2010 operation • Piquet periods are ~9 days: • From Monday afternoon to the Wednesday of the following week • Fully responsible from Wednesday morning after the 9:00 am running and operation meeting. • There is ~2 days overlap. • Piquet planning for 2009: Pascal Perret - LPC Clermont

  3. CALO Piquet Activities w45-46 • Recovering from power cut on Nov 3 after 18kV problems: • quite smooth … • HV problem with 1 LV line on Nov 2: • Maintenance on Nov 4 • Problem with SPD regulator board 7B0U on Nov 10 after a power cut (when trying to fix a problem in turbine project): • Detector access to check CB but problem fixed “magically” • Problem with PSDCST1 on Nov 13 • Regular switch on/off HV or go to cosmics activities • Time to time PVSS problems: • Links broken (Experts having some projects, …) • No proper transmission of the commands … • Experts activities: LED, pin diodes, … Pascal Perret - LPC Clermont

  4. DSS alarms, poweringprocedures • Instructions have been updated after a special meeting (Nov 12) • Instructions can be found on the twiki: • https://lbtwiki.cern.ch/pub/CALO/CaloPiquetDSS/DSS.pdf • The role of the SD piquet upon a DSS alarm is to • Understand the effect of the alarm, and restore normal operating conditions, with the help of SD experts and the Run Chief. • Inform the Run Chief about detector conditions and authorize to acknowledge the actions. • Rearming a TDM should be performed by the SLIMOS after approval by the Run Chief • Automatic turn ON of DCS and DAI has been disabled from the LHCb control • The SLIMOS should be informed before any intervention • To do by sharing temporarily the control or by acting from the main console. Pascal Perret - LPC Clermont

  5. News • Detector is now operated 24h 7/7 since Monday • Experts should not take any projects! In case of need: • Contact the piquet • The piquet should ask for authorization the shift leader or run chief • Request in the 9:00 am meeting • Release the projects after use(!) and inform the piquet→shift leader. • Cavern should be closed today • Restricted access mode temporarily should be possible if needed in case of problems … • Specific procedure: • Access request form to fill 24h in advance • Agreements needed: CALO management, run Chief, LHC contact, … • Discussion in the 9:00 am meeting • Piquet documentations, How To, … needed from the Experts! • Planning for 2010: send me your availabilities and constraints. Entry in the logbook! Pascal Perret - LPC Clermont

  6. LHC News From Andreas presentation this morning (slides attached): • Global machine check-out starting on Wednesday evening • Days 1-3: • Over the weekend we would hope to injection, circulate and capture both beams working with one beam and then the other. • Splash events (~30/experiment) on Saturday (or Friday?) night • Do we want to (can) be on? (5 MIP/cm2) • Days 4-13: get the beams into collisions at 450 GeV • LHC experts working during the day • More stable conditions during the nights • Stocking fillers with possibility of stable beam for at least 4 hours • 450 GeV collisions (2x2 1010) - First fill during day time • Days 14 – 18: Ramp up to 1.2 TeV & 450 GeVcollisions • Collisions during nights: needs of shifts? Pascal Perret - LPC Clermont