1 / 20

Calo preparation for 2015

Calo preparation for 2015. Goals: Trigger stability Good calibration for HLT2 processing Improved calibration ( timing, e/gamma response ) for all calo sub-detectors Improved monitoring. Calibration workshop 8/10/2013. The hardware changes :

korbin
Download Presentation

Calo preparation for 2015

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Calo preparation for 2015 Goals: Trigger stability Good calibration for HLT2 processing Improved calibration ( timing, e/gamma response) for all calo sub-detectors Improved monitoring

  2. Calibration workshop 8/10/2013 • The hardware changes : • DamagedEcal LED fiberswillbechanged -> improved gain monitoring (Iouri) • Exposed PMT willbereplaced ( hundreds) • The current calibration scheme for ECAL/PRS • Initial calibration from pi0 fine calibration (D.Savrina) using FMDST available ~ 4 weeks of data taking • Minimum biais events . Lowenergy in PS • ~ 80M eventsneeded • Iterativeprocedure • The more precisemethod • Ageingeffectcorrectedfrom e/p of tagged conversions 55 sets in 2013 (MNM) • Calibration fromelectronprovidealso calibration constant also for pre-shower. (O. Steinakin) availableonlyafter reconstruction. • Analytic solution • The current calibration scheme for Hcal • Ageing monitoring through LED response (2012) • PMT change whendeviationabove certain threshold • Controlled by Cs source run ( every TS) • Fine Hcal calibration on reconstructed data :100-200M eventsneeded to get a cell/cell calibration.

  3. LED system: HCAL 2012 LED-based HV corrections (17) Cs calibrations (3) sum/sumref, 56 central cells shutdown137Cs calibration TS1, 137Cs calibration TS2, 137Cs calibration TS3, 137Cs calibration results of Cs calibrations at TS is used as a starting point, then LED-based corrections total of 4 Cs calibrations and 17 LED-based corrections Precision of LED corrections is limited by: annealing during TS (and faster ageing afterwards) - PMT rate effect – variation within fill (can be optimized by regrouping PMTs, to be done @ LS1) uncertainty in the “plastic ageing” prediction – non linearity, annealing (the attempts to take the plastic ageing into account are visible) Yu. Guz 2013/10/09

  4. OccupancyMethod & dependence • For eachcellcalculate the occupancy ratio : - Threshold to bedetermined – Precision to bereached 1-2% Irina Machkhilyan LHCb-INT-2013-050 Calo meeting presentationsfrom Irina in each calo meeting since July 2012. http://indico.cern.ch/contributionDisplay.py?contribId=9&confId=217410 http://indico.cern.ch/contributionDisplay.py?contribId=8&confId=235526 http://indico.cern.ch/contributionDisplay.py?contribId=7&confId=244405 http://indico.cern.ch/contributionDisplay.py?contribId=5&confId=252503 http://indico.cern.ch/contributionDisplay.py?contribId=6&confId=260472

  5. Occupancy ratio #filldependence • - Dependsupon the fillm • Stable period in m to beused • Depends of the trigger type -> Minimum biais • 85 Hz for 8 hoursfillenough to reach • a 1% precision • - Magup/Magdownreference MagDown Magup

  6. Can beextended to Hcal Hcal / LED response Ecal/LED correlated to HV change

  7. PRS case Determination of the integration range complicated By the scale change of the adcspectrum . Checked on data as well.

  8. Method’schecks on 2012 data * Severalrunused to calculate the correction fromoccupancy . Bothpolarity Reference are in italic

  9. Ecal • E/p fit

  10. Hcal On rawHcal fluctuation at 2% level . More investigation on PMTsaffecting the trigger The accuracy of the methodcanbecompared to the LED Removing the Hcal HV change effectcalculatedfrom LED

  11. PS • E/p for electrons • Ecaloccupancy correction applied • Ecal & PS occupancy correction applied • Overcorrectionwhenboth are applied: • To beunderstood • Impact on L0 to beinvestigated but isexpected to besmall. Ecalcorrected Ecal +PS corrected

  12. For 2015 • 85 Hz minimum biais needed ~ 300K /hour • 1 :1.5 % precision all over the calorimeter (10 hours) • 2 consecutivefillcanbeused • Choose stable m period • Raw information shouldbeavailable for end of fillprocessing • Builttools able to determinerunswith stable mu • 2 options • Correction table / cell • HV change – preferredwillsolve the trigger instability • Cannotbereversed • PMT HV curvesused • With new LED system the ageing amplitude canbemonitored and used to cross check occupancy changes. • Initial calibration needsothermethods • P0 (Ecal) • Electrons (Ecal +PS)

  13. Is it possible ? • Need 85Hz of minimum biais event to calculateoccupancycell by cell ( occupancyfarm ?) • Analyse eventsonly in mu stable condition • Referencedependsupon the magneticfield • The PMT HV canbeupdatedwhen the deviation > 2-sigma of itsresolution • Possible to check the agreement with LED measurement (Ecal & Hcal) • This methodhad been used in November 2012 to update Ecal HV • It willremove the ageingdependancefrom trigger • Is it possible to fit with the new HLT1/HLT2 scheme • It has to becompleted by fine calibration • To bechecked in eventreplaying mode . ( 1st 2014 half)

  14. Data qualitycontrols • Improved data quality to point wrongbehavior: • On line (in investigation) : • The possibility to use the 85 Hz mimimum biais event to check the pi0 mass reconstruction as done in the fine calibration: with or withoutiterativeprocedure • e/p per zone for conversion to become standard plots • Pi0 Mass /zone willalsobecome standard DQ plots • e/p on hadronicchargedtracks • Currentdevelopement ( available in 2014) • Retuning of all corrections for electrons and pions • Clustering (2x2 investigate for the upgrade ) • Initial precise calibration will come from pi0 , electrons , hadrons: FMDST schemestillneeded.

  15. spares

  16. 2012 procedure • Reference calibration fromreconstructedp0 • Processingusing the current calibration • Extract correction coefficient (Dasha) • Need FMDST to beavailable • Processing 2 weeks Referenceused All 1

  17. Ageing trend general The correction are dominated by the higher flux in each zone. They correspond to higherageing. Fraction gain lost HV change end of august ~1% /100pb-1 HV change: occupancymethod End of November . Back to initial calibration. ~0.4%/100pb-1 Annealingeffect : Christmas stop 4% annealing in average Lumi (pb-1)

  18. E/p for electron (O.Steniakin) Fine calibration applied on alreadycalibrated data

  19. HCAL E/p calibration: track selection • For all tracks from Rec/Track/Best : • find associated cells in HCAL, ECAL, PS laying at the track extrapolation; calculate E(HCAL), E(ECAL), E(PS) • using the CaloEnergyForTrack tool (Vanya) (AddNeighbors=1) • keep only tracks with E(HCAL)>0 • require isolation in HCAL (no HCAL cells associated with given track is shared with any other track); • keep only long tracks, -200<z<400mm • reject muons (tight and loose) • reject protons (by RICH): the HCAL responses to and differ, which distorts calibration • require E(ECAL) < 800 MeV && 0< E(PRS) < 20, to reject showers started much before HCAL • The track position in HCAL is defined as the position of a cell with max energy deposition. • further refinement: • cut on ptrack: 7 GeV for all cells, somewhat higher for the innermost ones • (safety) cut on E(HCAL): 2.5 GeV for all cells, somewhat higher for the innermost ones Yu. Guz 2013/10/09

  20. HCAL response to hadrons, data More uniform than response to muons: ~4% RMS for both inner and outer (borders excluded). Yu. Guz 2013/10/09

More Related