1 / 8

By Ei

Bad example. By Ei. Diagrams. Not legible. Animations and text. Project Parameters Planned: Construction time Commissioning time Capital Cost (including planned commissioning cost capitilised) Construction approach (turnkey or other) Company engineering staff involvement

ailis
Download Presentation

By Ei

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bad example By Ei

  2. Diagrams • Not legible

  3. Animations and text Project Parameters Planned: • Construction time • Commissioning time • Capital Cost (including planned commissioning cost capitilised) • Construction approach (turnkey or other) • Company engineering staff involvement Project Outcome Construction time Commissioning time Capital Cost (including planned commissioning cost capitilised)

  4. Too long paragraphs and text transitions • The closest approximation of behavioral thresholds with the ASSR technique was at 1000 Hz whilst the poorest approximation was at 500 Hz. In an analysis of the difference between ASSR approximations of behavioral thresholds in the left ears (n=6) compared to the right ears (n=6) a slight increase in difference scores were noticed at all frequencies in the right ear. This may in part be attributed to higher modulation frequencies for the test frequencies in the right ear (91-99 Hz) compared to the modulation frequencies in the left ear (82-89 Hz). The sample, however, is too small to substantiate this inference.  

  5. Graphs ( Heading contrast Incorrct) • Graphs too small and use of animation inicator unnessesary

  6. Too much text and picture behind does not work • Construction time – 30 months from authorisation to 1st briquette • Commissioning time – not clearly defined, but similar to Western Australia HBI duration of 6 months • Capital cost (including planned commissioning cost capitalized) – US$797 million • Construction time – 35 months from authorisation to 1st briquette • Commissioning time – not fully commissioned (see notes below) • Capital cost (Including actual commissioning cost capitalized) – US$910 millionConstruction approach (turnkey or other) – process design by VAI, self managed by Orinoco Iron (JV partner) using a number of construction contractors. • Company engineering staff involvement – minimal BHPB involvement

  7. Photographs distorted

  8. Clip art distorted and nocontrast in font

More Related