1 / 7

Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas ENCODERS

Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas ENCODERS PM#06 18-19 June 2006. ENCODERS - Update Status. AZ encoder baseline: Reading heads possibly reduced to 8 instead of 10; decision at the final choice of bearing

jin-flowers
Download Presentation

Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas ENCODERS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas • ENCODERS • PM#06 18-19 June 2006

  2. ENCODERS - Update Status • AZ encoder baseline: Reading heads possibly reduced to 8 instead of 10; decision at the final choice of bearing Alternative new interpolation boards excluded by the supplier; IK320V remains the actual and future solution. Production guaranteed. Waiting supplier schedule for tape qualification tests. • EL encoder baseline: 120mm internal diameter solution under analysis from the point of view of performances – 150mm study already implemented. IP protection studied by EIE waiting proposal from supplier; this confirmed its availability to supply the complete set protected as per prototype. Mounting and alignment w.r.t. the shaft issues under analyses. • Alternative Solutions: Still under discussion; difficulties in having information from US companies (TAA/TDL required).

  3. Encoders Block Diagram

  4. Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas • ACU • PM#06 18-19 June 2006

  5. Preliminary Crate Layout - Front

  6. Preliminary PCU Layout

More Related