Stato della farm di COMPASS-TS

Stato della farm di COMPASS-TS. CSNI Roma, 21 maggio 2001 Benigno Gobbo INFN Trieste Benigno.gobbo@cern.ch. Progetto e finanziamenti. Finalizzazione del progetto: maggio 2000 Costo previsto: 480 MITL Discussione in CN: giugno 2000 Presentazione del progetto

alva
Download Presentation

Stato della farm di COMPASS-TS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Stato della farm di COMPASS-TS CSNI Roma, 21 maggio 2001 Benigno Gobbo INFN Trieste Benigno.gobbo@cern.ch CSNI

  2. Progetto e finanziamenti • Finalizzazione del progetto: maggio 2000 • Costo previsto: 480 MITL • Discussione in CN: giugno 2000 • Presentazione del progetto • Viene approvato dalla Commissione • Richieste: 276 MITL per la I parte + 204 MITL per il completamento • Finanziamento ottenuto: 200 MITL • Discussione in CN: settembre 2000 • Richiesto finanziamento per il completamento della farm nel 2001 • Sub Judice alla messa in funzione della I parte: 240 MITL CSNI

  3. La farm 2000 • Definizione dettagli hardware (in base alle assegnazioni) • Verifica compatibilità linux • Indagini su motherboard, RAID controller, etc. • Minimizzazione dei prezzi • Lunga ed accurata indagine di mercato • Ordinazioni e consegne • Ordini: fine settembre 2000 - novembre 2000 • Con il supporto del Gruppo Calcolo • Consegna: fine ottobre 2000 – fine gennaio 2001 • Spazi in Sezione • Forte richiesta di COMPASS per attrezzare una stanza per la farm • Individuata una sala per “calcolo esperimenti” (COMPASS, ALICE, CDF, …) • Allestimento della stanza (UPS, isolamento, climatizzazione) • Fondi: sezione • Man Power: allestimento completamente gestito dal gruppo COMPASS-TS con il supporto del Gruppo Calcolo CSNI

  4. La farm 2000 (continuazione) • Installazione hardware e software, test • Completamente svolto dal gruppo COMPASS-TS • Svolti in parallelo • Sviluppo/test di tool per automatizzare installazioni ed upgrade e semplificare la gestione • Uso massimo di servizi centralizzati (AFS, etc.) • Test di stabilità e prestazioni su Linux • Software • Linux RedHat 6.2 + AFS/SSH (Caspur) + driver specifici • Software CERN (CERNLib, ANAPHE, ROOT, DATE) • Sofware Compass (Coral, COMGeant) • Completamento installazione hardware • fine gennaio 2001 • Utilizzabilità della farm • febbraio 2001 • Ancora in corso di sperimentazione : (free!) software per gestione code batch (non indispensabile per ora) • Sun Grid Engine (era Codine): ottimo ma per ora senza supporto AFS • PBS in fase di studio (passaggio password criptata per ottenere i token AFS…) CSNI

  5. La farm 2000 (continuazione) • Composizione • 11 Client • CPU: 2 PIII 800 MHz, dischi: 2x20 GB EIDE, RAM: 256 MB, LAN: 100baseT • Costo: 3 MITL + IVA • PC Server • CPU: 2 PIII 800 MHz, dischi: 2x30 GB EIDE, RAM: 512 MB, LAN: 1000baseSX, Controller SCSI • Costo: 6.8 MITL + IVA • Sun Server (1/2) • CPU: 1 SparcIII 750 MHz, disco: 18 MB SCSI, RAM: 512 MB, LAN: 1000baseSX • Costo: 24 MITL + IVA • PC Server di backup + Accesso utenti: • CPU: 2 PIII 800 MHz, dischi: 2x30 GB EIDE, RAM: 512 MB, LAN: 100baseT, Controller SCSI • Costo: 5.4 MITL + IVA CSNI

  6. La farm 2000 (continuazione) • PC Server EIDE • CPU: 2x PIII 700 MHz, dischi: 2x15 GB EIDE + 14x75 GB EIDE, RAM: 512 MB, LAN: 1000baseSX. • Costo: 28 kCHF • Switch 3com • 36x 100baseT + 2x 1000baseSX • Costo: 8.1 MITL + IVA • RAID SCSI • Sistema CMD 54464-RM (8x 73 GB + controller CRD 5440) • Costo: 46.9 MITL + IVA • Altro • 2x KVM switch Belkin Omniview Pro 16 porte • Costo: 1.7 MITL + IVA / pezzo • Monitor 19”, tastiera, mouse • Costo: 1.1 MITL + IVA • Cavi KVM, fibre ottiche e doppino rete, : • Costo: 1.4 MITL + IVA CSNI

  7. La farm 2000 (continuazione) • Spesa complessiva • 200.187 MITL (IVA inclusa) • Infrastrutture (su fondi dalla sezione) • Sistema UPS dedicato: Chloride Linear da 12 kVA • Costo: 14 MITL + IVA • 2x condizionatori: Clivet WH 15 (3.9 kW potenza frigorifera) • Costo: 10 MITL +IVA • Cablaggio • Isolamento (termico) della stanza CSNI

  8. La farm 2000 (continuazione) CSNI

  9. Attività sulla farm • In corso o in fase d’inizio • Implementazione e test del “job-split” • Prove di accesso remoto ai dati • R. Birsa, V. Duic, B. G., M. Lamanna • Test software su piattaforme eterogenee (non possibile sulla CCF) • R. Birsa, B. G. • Proseguimento sviluppo software di ricostruzione del RICH1 • P. Schiavon • Produzione MC e loro analisi per trasverso • A. Martin, P. Pagano CSNI

  10. Attività sulla farm (continuazione) • Dopo il completamento della farm (serve la potenza completa!) • Processing dati RAW per test specifici • CCF al CERN verosimilmente saturata/sottodimensionata • Analisi (m)DST prodotti (qui ed al CERN) • Attività offline di COMPASS-TS • Inoltre • Fino al 2002: studio risposta del RICH1 • Attività RICH1 di COMPASS-TS CSNI

  11. Completamento della farm • 19 PC Client (30) ; 1 TB spazio disco ( 2 TB); Tape Library; completamento Sun. CSNI

  12. Completamento della farm (continuazione) • Costi • PC Client: 2xPIII 800-866 MHz, 2x 30GB EIDE, 256 MB RAM, 100baseT • Costo: 57 MITL + IVA • Completamento Sun: CPU + disco 18 GB SCSI • Costo: 16 MITL + 2.7 MITL = 18.7 MITL + IVA • IBM Tape Library Ultrium 2 drive • Costo: 65 MITL + IVA • Sistema disco 1 TB • Costo: 90 MITL + IVA • Altro: Modulo 1000baseSX per 3com, 1000baseSX adapter , cavi KVM • Costo: 4 MITL + IVA • Totale: 280 MITL IVA compresa ( 145 k€ ) • Per saperne di più: • www.ts.infn.it/acid • acid@ts.infn.it CSNI